My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07339
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:35:51 PM
Creation date
10/9/2006 6:25:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
9/23/1981
Title
Azure Sheephorn Reservoir Project-Corres Reports etc-1980-1987-CO River Water Cons Dist-Amendment of Application to Include Municipal Subdistrict-N CO Water Cons Dist as Joint Applicant
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. . <br /> <br />(a) Prior to the construction of Azure Reservoir <br /> <br />and Power Project, or alternate facility, the Subdistrict <br /> <br />will place 3000 acre feet of water in Granby Reservoir <br /> <br />for beneficial use, without waste, in Middle Park and <br /> <br />will release 2000 acre feet thereof for all beneficial <br /> <br />uses, except for instream uses and industrial uses <br /> <br />(unless the industrial use is within a municipality and <br />through its municipal water system), and the additional <br /> <br />1000 acre feet of such water for municipal and domestic <br /> <br />uses in Middle Park. The release of this 1000 acre feet <br /> <br />shall be made only if domestic and municipal uses in <br /> <br /> <br />Middle Park have not been met adequately from the 2000 <br /> <br /> <br />acre feet of water previously released. <br /> <br /> <br />(b) After the Azure Reservoir and Power <br /> <br />Project, or alternate facility, has been constructed, <br /> <br />the Subdistrict will place 2000 acre feet of water in <br /> <br />Granby Reservoir for beneficial use, without waste, in <br /> <br />Middle Park and will release said 2000 acre feet for all <br /> <br />beneficial uses, except for instream uses and industrial <br /> <br /> <br />uses (unless the 'industrial use is within a municipality <br /> <br />and through its njunicipal water system). Subdistric,t <br />\ <br />will additionally place, at the direction of Middle <br />Park, 1000 acre feet of water in either (1) Azure Reser- <br />voir, or the alternate facility, for all beneficial uses <br />in Middle Park and thereby reduce the 3000 acre foot <br />capacity reserved to Subdistrict in paragraphs 9 Second <br />and 29 to 2000 acre feet, or (2) Granby Reservoir for <br />municipal and domestic uses in Middle Park. If said <br />1000 acre feet is placed in Granby Reservoir, all pumping <br />costs incurred by Subdistrict to store said water in <br /> <br />Granby Reservoir shall be reimbursed annually to Subdis- <br />trict by Middle Park. <br /> <br />These waters shall be released by Subdistrict, upon <br /> <br />request of Middle Park and subject to operational criteria <br /> <br />0934 <br /> <br />- <br /> <br />-15- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.