My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07339
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:35:51 PM
Creation date
10/9/2006 6:25:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
9/23/1981
Title
Azure Sheephorn Reservoir Project-Corres Reports etc-1980-1987-CO River Water Cons Dist-Amendment of Application to Include Municipal Subdistrict-N CO Water Cons Dist as Joint Applicant
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />the River District all permits, licenses, engineering plans, <br />drawings, specifications and other material acquired or <br />produced by the Subdistrict or others in connection with the <br />Azure Project or said alternate facility. River District <br />shall have the right to proceed with said Project(s) free of <br />the obligations of this Agreement with respect thereto. To <br />the extent the failure to initiate construction within the <br />periods herein contemplated for Azure Reservoir and Power <br />Plant, or the alternate facility, is due to reasonably avoidable <br />fault or delay on the part of Subdistrict, the time within <br />which construction was to have been initiated shall be extended <br />a like period. For the purposes of this Agreement, the <br />initiation of construction shall be deemed to have occurred <br />on the date construction contracts are signed which result in <br />physical onsite work on the facilities contemplated hereunder. <br />All lands and rights-of-way, if any, acquired by Subdistrict <br />for said Project may be acquired by River District at cost, <br />plus interest thereon at the rate being paid by Subdistrict <br />thereon, if notice of River District's desire to obtain said <br />lands and rights-of-way is given to Subdistrict in writing <br />within six months after any agreement to forego said additional <br />work. <br /> <br />13. Windy Gap Project diversions will be made <br />strictly under the priority system (including exchanges), <br />thus protecting all conditional and absolute water rights <br />senior in priority, unless specifically subordinated to Windy <br />Gap decrees. <br />, 14. Subdistrict will comply with all terms and <br />provisions of Senate Document 80 in the design, construction <br />and operation of the Windy Gap Project. <br />15. The Parties acknowledge and agree that Sub- <br />district may initiate immediately the construction of its <br />Windy Gap Project prior to the construction of Azure Reservoir <br />and Power Project, which latter facility is intended to <br />comply with the provisions of C.R.S. 1973, 37-45-118(1) (b) (IV); <br /> <br />.;' <br /> <br />0937 <br /> <br />-12- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.