My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06939
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06939
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:08:29 PM
Creation date
10/9/2006 6:10:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
4/5/1948
Author
R A Wheeler
Title
San Luis Valley Project Closed Basin Division -1949-1951 - Rio Grande and Tributaries, New Mexico
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />- 4 - <br /> <br /> <br />- <br /> <br />'" p ~ ....." ~ <br />\Jv .....,J t <br /> <br />E%llF <br />Tos The Secretary of the 1~ <br /> <br />t~ough the Lower Valley and provided levees, bank protection and control <br />works, at an approximate cost of $4,000,000. Various im;n-ove~ents have <br />teen constructed in the Rio Grande basin h1 several other Federal agencies, <br />1nclu:ling the 5011 Conservation Service, Indian Service, Forest Service, <br />Fish and. Wildlife Service, and. the Civilian Conservation Corps. These all <br />aid in the alleTlatlon of nced damages, mainly, however, in localized <br />areas. The l,fiddle Rio Grande Conservanq District in 1935 completed works <br />to rrovide Irrigation, drainage and flood control for about 128,000 acres <br />of land In the &Siddle Valley. These works include El Vado DaJD and Reser- <br />voir, located on Rio Chama near Tierra Amarilla and having a capacity of <br />approximately 200,000 acre-feet, four diversion dams and three diversion <br />heeding. on Rio Grande in liddle Volle", about 630 milea of irrigation <br />canals and laterals, about 340 m.1les of interior and riverl!lide drainage <br />ditches, and about 190 miles at riverside levees. The original cost of <br />construction was S9,130,100, of which tl,753,100 was for E1 Vado Dam. <br /> <br />6. Local interests desire reservoirs on Rio Grande and its major <br />tritutaries to provide storage for nood control and for supplemental irri- <br />ga tion water supply. They also desire measurel!l for the control of nood- <br />borne sedi:!8nt. EsJl8nola Valley interests advocate construction of dams <br />above the confluence of Rio Chama and Rio Grande to provide flood control <br />both for Uiddle and E.openola Veli.,... tntereata in the IIiddl. Valle". <br />chiefly the ~iddle Rio Grande Co~ervancy District and the Middle Rio <br />Gr9nde Farmers Association favor nood control dams on Rio Grande and tribu- <br />taries above Jemez Creek and a dam in Jemez Canyon primarily to retain Bedi- <br />cent, for the protection of the LU.ddle Valley. They also urge improvement <br />of the Rio Grande channel through Middle Valley to solve flood and drainage <br />problet:lS, aoo recolllMnd that the Corps of Engineers be assigned the respon- <br />sibility for flood control and the Bureau of Reclamation that for the irri- <br />gation and drainage phase together with the administration of the Middle <br />Valley agricultural area. Interests in the Lower Valley advocate flood <br />and sediment control dams to reduce damage from floods on ephemeral tribu- <br />taries, and oppose major flood control dams above Elephant Butte Reservoir <br />which .ould deplete the irrigation water supply available under the terms <br />of the Rio Grande Compact.. Bluewater Valley interests desire nood and <br />sediment control in the irrigated area of the Bluewater-Toltec Irrigation <br />District. 111 agencies and organizations express wUlingness to cooperate <br />to Ule limits of their respective authorities and tinances. <br /> <br />7. The district engineer finds that noed. problems are interrelated <br />.ith the general problem of water resource development in the Rio Grande <br />basin and. he baa given careful consideration to all water uses in Ule <br />formulation of the most suitable plan tor flood control which .ould in- <br />clude all economiea1ly Justifiable, improvements. A comprehensive plan <br />of water resource development incorporating provisions for flood control <br />has baen developed by the coordinated effort of the district engineer and <br />field representatives of the Bureau of Reclamation, the Department of Agri- <br />culture, the Federal Power Commission, and other Federal and state agencies <br />concl!rned. This plan provides generally fori (a) nood control and major <br />dra1Mge (nood coctrol pha.. of the plan); (b) rehabilitation of the <br />Middle Rio Grande Conservancy District; (c) power development; (d) recre- <br />ational develo~nt; (e) fish and wildlife development; (f) watershed <br />
The URL can be used to link to this page
Your browser does not support the video tag.