My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06936
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:08:28 PM
Creation date
10/9/2006 6:10:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.800
Description
Colorado River - Colorado River Basin - Colorado River Basin General Correspondence
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1982
Title
Water for Energy, Upper Colorado Basin Monthly Report, July 1982
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,I' 002.314 <br /> <br />. <br /> <br />. <br /> <br />2 <br /> <br />Utah Energy Office <br /> <br />Contact to secure information on <br />the status of oil shale and tar <br />sand projects in Utah <br /> <br />Oil Shale Companies et al. <br /> <br />Contact to secure infonnation on <br />the status of oil shale and tar <br />semel projects <br /> <br />WELUT Resource ~bnagement <br />Methous Group (lU>I\IG) <br /> <br />:-Ieeting to confinn the updating <br />;1Jld redigitizing of UCRB River <br />R('ach 1-laps <br /> <br />B. Plans for future Contacts. <br /> <br />During the month of August the U.S. Bureau of Reclamation Upper <br />Colorado Division Office \\Iill be contacted to secure infonnation <br />on the operation of Colorado River Storage and participating projects. <br /> <br />C. Progress on Database Development. <br /> <br />111e development and revie,,, of the catalog of UCRB Water and Energy <br />Projects is no", complete and is being typed in final fonn. Distri- <br />bution of a limited number of copies is plarulCd for September 1982. <br /> <br />111e Development Net\\lork Database also is nearing completion, keyplU1ch- <br />ing wns completed in .July ,md error checking is lmderway. Final data <br />veri Cicnt i on by the FWS field persorme lis schedu led for August and <br />the database will be operational by September. <br /> <br />D. Develop a ~'\NAGE ~uatic ~esource Qata!2.ase (tvIi\QRDB) for the UCRB. <br /> <br />111e first draft of the lvlAQRDB data entry mnnual has been completed <br />and is nOl, wluer revie\\l. \iork will begi n on inJluting data which was <br />collected over the past months into lvli\QRDB as soon as the structure <br />of the database has been reviewed and approved. Since the last <br />progress report, lvl<\QRDB has been restructured and now contains 26 <br />major data categories several of "hich have several subcategories. <br />This structure has changed somewhat from the structure presented in <br />the last month's progess report, consequently, an updated lvI\QIliJB <br />structure is presenteu as Exhibit ,\. <br /> <br />Concurrently \\Iork is proceeding on the upuating and redigitization of <br />the EPA River Reach :-Iaps. The upuating and redigi tization is being <br />accomplished through 811 existing contract WELUT has with Environmental <br />Research and Teclmology, a Fort Collins consulting finn. When the <br />upuatingi s completell, the river reach numbers "ill be entered into the <br />H\QRUB nno DNllB, enabling d;ltabase USel"S to access other hydrological <br />oatabases such as STORET ;U1U WJ\TST0RE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.