Laserfiche WebLink
<br /> <br />11'0'2 ~t;l <br /> <br />. <br /> <br />. <br /> <br /> 9 <br />Table 2. Summa ry of Wi 1 d 1 i fe Annually <br />Kind and Unit Without Wi th Ga in 0 r <br />Area Project Project Loss <br />Upland game Man-day 3,200 600 -2,600 <br />Waterfowl <br />Hunting Man- day 2,200 1,000 -1,200 <br />Production N umbe r 12,000 0 -12,000 <br />Wildlife-oriented Man-day 1,000 500 -500 <br />recreation <br /> <br />DISCUSSION <br /> <br />Fishing at San Luis Lake could be improved by provision of access <br />and adequate facilities to serve the needs of fishermen at the lake. <br />These would include a boat-launching ramp, an access road, parking <br />area, water, and sanitary facilities. Cost of this unit based on <br />1969 prices is estimated at $30,000. Operation, maintenance, and <br />replacement costs are estimated at $1,000 annually. Specific loca- <br />tions and design of the facilities can be determined during later <br />project planning when detailed information becomes available. Cost <br />of the facilities are shown in Table 3. <br /> <br />Table 3. Cost of Fishing Facilities <br />at San Luis Lake <br /> <br />Item Cost <br /> <br />Access road, gravel, 14' wide, 1/2 mi le long <br />Boat-launching ramp, gravel, 3D' x 12' <br />Parking area, gravel, 25 units <br />Well, 100 feet deep <br />Sanitary facilities, concrete, pit type <br />Engineering, administration, and supervision <br />Contingencies <br />Total <br /> <br />$10,000 <br />5,000 <br />2,000 <br />1,000 <br />2,000 <br />5,000 <br />5,000 <br />$30,000 <br /> <br />Annual 0, M, and R <br /> <br />$1,000 <br />