Laserfiche WebLink
<br />" <br /> <br />. .' <br /> <br />002207 <br /> <br />Chute-type spillway on north side, 50,000 cfs capacity. <br />Power facti Ii ties on south side of river. <br />Dam would rise 210 ft from riverbed elevation (5925 ft). <br />67 mw plant capacity (annual about 20%). <br /> <br />,.' <br /> <br />Cross Mountain <br />Dam in lower end of canyon. <br />Dam would rise 240 ft above river bed to elevation of 5880 ft; <br />may raise it another 5 - 10 ft. <br />5200 surface acres. <br />145,000 acre-feet storage capacity; 100,000 acre-feet would be <br />available for re-regulating. <br />Drawdown maximum of 25 vertical feet. <br />Concrete arch construction. <br />Spillways - 3 openings in dam near crest; plunge pool lined to <br />prevent erosion below dam. <br />Power features in south side of dam. <br />Old fault exists at the mouth of Cross Mountain Gorge. <br />Designed as re-regulating for Juniper. <br />Maximum flow/discharge capacity - 5000 cfs. <br />"Small" outlet for minimum flow discharge - 100 cfs. <br /> <br />/ <br /> <br />Miscellaneous <br />Project is not ,"using" any water, just shifting the time of flow. <br />Projected evaporative loss: Juniper - 63 cfs <br />Cross Mtn - 23 cfs <br />Reservior volumes in brochure are not current; CRWCD now favors <br />higher capacities. <br /> <br />EDAW - Mike Bowie <br /> <br />(offices in Ft. Collins and San Francisco) <br /> <br />A second meeting will be held with CRWCD consultants and agency <br />biologists to plan "mitigation measures". <br /> <br />4 "exhibits" will be prepared by CRWCD environmental consultants for <br />submission to FERC. These will provide the basis for a draft EIS: <br /> <br />Exhibit W - <br />Exhibit R <br />Exhibit V <br /> <br />Environmental Report (EDAI,) <br />Plan for Recreational Use (EDAW) <br />Plan for Preservation of Visual and Cultural <br />Resources (EDAW) <br />Fish and Wildlife Resources (subcontracted to ERT-ECI) <br /> <br />Exhibit S <br /> <br />Deadline for submission - February 1, 1980. <br /> <br />Exhibit <br />1) <br />2) <br />3) <br />4) <br /> <br />Development <br />describe existing environment <br />describe proj ect <br />assess impacts on environment <br />mitigating measures (Exhibits R, S and V will have specific <br />Mitigation Plans) <br /> <br />2 <br />