Laserfiche WebLink
<br />..:: -~..)~".." <br />" ' 001178 <br /> <br />. <br /> <br />. <br /> <br />in stage 3 of the project so long as: (I) all such wells are capped after <br /> <br /> <br />being pumped tested and not. put into I'roductior. until the cone.ent of the <br /> <br /> <br />Colorado Water Conservation Board and thE Rio Grande Water Conservation <br /> <br /> <br />District has be~n give" to place such ,,'ells in production, (2) the project <br /> <br /> <br />proceelis in substantial conformity with He DefinitE; Plan Report for said <br /> <br /> <br />project, and (3) the U.S. Bun.au of Reclamation proceeds ",it), diligenc~ <br /> <br /> <br />in the construction of stage 1-2 of the project; and (4) construction of <br /> <br /> <br />such we:ls is in co~plian~e with applica11e ~tate law, <br /> <br />BE IT FURTHER RESOLVED that thE, Rio Grand0 Water Conservation District <br /> <br />IS not, by this action, giving its consent to the. U~S~ BureE=u of Reclar::.ation <br /> <br /> <br />to start construction on tiny other features of stages 3, "4 and:: of the J:..roject, <br /> <br /> <br />except those feG.:tur.es necessary for preconE:truction' such as testing and pre- <br /> <br />paration of design data. <br />