Laserfiche WebLink
<br />",," 0008Q2 <br />\ <br /> <br />. <br /> <br />(Powres.t) was revised to re operate all water rights associated with the receiving <br />instream flow so that reservoir releases are immediately available to the entire <br />instream flow reach before other structures are allowed to benefit from the reservoir <br />release. Since the Phase II application typically tied reservoir releases to only the <br />most upstream instream flow, this enhancement, which is more correct, may cause <br />slight differences when compared to the Phase II results. Exhibits 1-2 show standard <br />· .xdd and · .xir output for a simple example (Example 23). <br /> <br />Impact of the StateMod Enhancement To evaluate the impact of the StateMod <br />enhancement results were compared to the Phase II results for two runs: the historic and <br />the calculated. As presented in Exhibits 3 and 4, the model enhancement had no impact <br />on historical results other than at the instream flow locations. Exhibits 5 and 6, show a <br />small impact to 4 structures (maximum average annual difference = 48 at). These <br />differences are related to the treatment of an instream flow as a reach rather than a series <br />of unique structures. The enhancement made for year III is considered more accurate. <br /> <br />fn=\w\statem\whitet\word\mm20 1 ,doc <br /> <br />2 <br />