My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06079
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:04:21 PM
Creation date
10/9/2006 5:41:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Boyle Engineering
Title
Agricultural Engineering Study - Mancos Watershed - Task D-E - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1511 <br /> <br /> <br />estimated based on average depths of excavation for the respective <br /> <br /> <br />lengths. Grouting quantities were estimated for holes 10 feet on- <br /> <br /> <br />center drilled to a depth of 30 feet below the assumed bedrock <br /> <br /> <br />sur face, and us ing an assumed 0.5 bag of cemen t per foot for grout ing. <br /> <br />Work item unit costs were estimated from an analysis of actual <br /> <br /> <br />construction costs of ten comparable dams constructed within the <br /> <br /> <br />last eight years. These included eight embankment dams with various <br /> <br /> <br />river diversion programs, embankment heights and slopes, grouting <br /> <br /> <br />programs, foundation preparation programs, and bid item break- <br /> <br /> <br />downs. The unit costs were escalated to estimated early-1987 price <br /> <br /> <br />levels and were adjusted to reflect the effect of the remoteness of <br /> <br /> <br />the construction site. <br /> <br />Preliminary cost estimates for both sizes of reservoirs are <br /> <br /> <br />contained in Appendix D.3. The costs of the major work items were <br /> <br /> <br />calculated as the product of the estimated quantities and unit costs. <br /> <br /> <br />Twenty-five percent of the total cost of the major work items was <br /> <br /> <br />added as an allowance for unlisted items and construction <br /> <br /> <br />contingencies to obtain the estimated Contract Cost. Engineering <br /> <br /> <br />and construction administration costs of 20 percent of the Contract <br /> <br /> <br />Cost were then added to obtain the total Construction Cost. To this <br /> <br /> <br />was added interest at 8 3/8 percent during an assumed 2-year <br /> <br /> <br />construction per iod to obtain the total Capi tal Cost for each <br /> <br /> <br />reservoir. <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.