Description
Section D General Studies-Federal Projects-General
Date
4/18/1980
Title
Moon Lake Power Plant Project-Reports 1979-80-Availability of Water and Impact on Water Quality from a Power Plant to be Constructed by Deseret Generation and Transmission Cooperative
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />4 <br /> <br />. <br /> <br />The Bonanza Dam schedule is understood to be as follows: <br /> <br />May I, 1980 <br /> <br />Contract with EIS consultant <br /> <br />September I, 1980 <br /> <br />Ers completed by consultant. <br /> <br />June I, 1980 <br /> <br />Section 7 ~eview due to BLM from USFWS <br /> <br />Spring 1981 <br /> <br />Ers approval, engineering plans approved and <br />8LM right-of-way applications approved <br /> <br />Summer 1981 <br /> <br />Construction start-up <br /> <br />Fall 1983 <br /> <br />Construction completed <br /> <br />spring 1984 <br /> <br />Filling of reservoir completed <br /> <br />As of this date, it is our understanding that the State of Utah has; <br /> <br />(1) prepared preliminary designs for the reservoir; (2) acquired the needed <br /> <br />financing through action of the state legislature; and (3) has initiated the <br /> <br />preliminary EIS process to the extent that 8LM has been identified as the <br /> <br />Lead Agency for the preparation of the EIS. <br /> <br />The Taylor Draw Reservoir schedule is understood to be as follows: <br /> <br />December 1980 <br /> <br />Engineering plans completed <br /> <br />April, 1981 <br /> <br />EIS approval <br /> <br />Mid-Sununer 1981 <br /> <br />Construction start-up <br /> <br />Spring 1983 <br /> <br />Construction completed <br /> <br />Proponents of the Taylor Draw Reservoir, as of this date, have completed an <br />I <br /> <br />environmental analysis report consis~ing of a literature search and site <br /> <br />visits. However, as of this date a Lead Agency has yet to be identified who <br />-- <br /> <br />will prepare the EIS. <br /> <br />Proponents in Rio Blanco County in Colorado have <br /> <br />I, <br /> <br />0303 <br />. \ <br />n V" <br />iJ~' <br />