My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05803
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC05803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:18:34 AM
Creation date
10/9/2006 5:30:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
2/17/1981
Author
William Paddock
Title
Azure Sheephorn Reservoir Project-Corres Reports etc-1980-1987-Oak Creek Power Company-Petition for the Imposition of Certain Conditions on any Preliminary Work Permit Issued to Applicant
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1,1 <br /> <br />.. <br /> <br />. <br /> <br />,,) <br /> <br />I' <br /> <br />UNITED STATES OF A~ERICA <br /> <br />FEDERAL ENERGY REGULATORY COMMISSION <br /> <br />OAK CREEK POWER COMPANY <br /> <br />PROJECT ,'110. 2773 <br /> <br />PETITION OF THE DEPARTMENT OF NATURAL <br />RESOURCES, STATE OF COLORADO FOR THE IMPOSITIo~ <br />OF CERTAIN CONDITIJNS ON ANY PRELIMINARY wORK <br />PERMIT ISSUED TO APPLICANT <br /> <br />Tnis petition is in response to the "Oak Creek water <br />and Power Project, Field Investigation, Work Plan and Sched- <br />ule" suomi tted by the Oak Creek Power Company appl icant in <br />project No. 2773. The purpose of this petition is two-fold. <br />First. it is to re-assert tne position of the Department <br />of Natural Resources that the F.E.R.C. should prepare an <br />assessment of the environmental impacts of the proposed pre- <br />1 iminary permit periOd studies. The second purpose of this <br />petition is to request certain minimum conditions be placed <br />upon any jJrel iminary percnit issued in this matter. <br /> <br />~&]~lBfQ_~~~1~2j~~~I!L_!~~&~~tl~~I <br /> <br />The "Oak Creek water and Po.er Project. Field Investi- <br />gation. Work Plan and Schedule" shows that applicant will <br />carry out extensive geological, geophysical, biological. <br />~ydrological and otner investigations during the preliminary <br />oermit study periOd. These stuJies. when comparea with the <br />data suomitted by the Department of Natural Resources. show <br />there is considerable potential for adverse environmental <br />i~pacts during the study perioo. Based on these submissions <br />'it can nOt De categorically determined that iss~ance of a <br />oreliminary permit ",ill not have significant i:npacts on tne <br />human environment. ThUS. for the reasons stated in part II <br />C of the "Petition of tne National ~ildlife Federation. et <br />31. ...11 the F.~.R.C. must prepare an environmental assess- <br />ment of tne proposed preliminary permit stuoies. This envi- <br />ronmental assessment must be prepared prior to the issuance <br />of any prel iminary permi~. <br /> <br />i <br />:~ <br /> <br />0961 <br /> <br />! '1~" <br />
The URL can be used to link to this page
Your browser does not support the video tag.