Laserfiche WebLink
<br />OJJ493 <br /> <br />STATUS OF PLANNING <br /> <br />From the favorable findings of the Reconnaissance Report dated March <br />1964 and subsequent reviews by state and local interests, a prel~- <br />inary study to determine the magnitude of development in the basin <br />was scheduled and completed in the summer of 1965. <br /> <br />Investigations leading toward a feasibility or authorizing report <br />are presently in progress. These follow generally the outline as <br />recommended in the 1965 preliminary study. <br /> <br />Satisfactory progress has been made in the investigations. The de- <br />tailed land classification, drainage, agricultural economy, plan <br />formulation, and water supply studies are essentially complete. <br />The field surveys are finished. Geologic drilling and construction <br />materials exploration for the dams is complete. Designs and esti- <br />mates and financial and economic analyses are progressing. The pro- <br />posed report is scheduled for completion in June 1971. <br /> <br />i.-' <br /> <br />~, <br />h 1 <br />, <br /> <br />1 <br />:.J <br />w,l <br />,..l <br /> <br />'':1 <br />, <br /> <br />3 <br />