My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05545
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:01:41 PM
Creation date
10/9/2006 5:17:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume III-B
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0024J9 <br /> <br />DuranQO PumoinQ Plant - StaQe I <br /> <br />detail drawings, review by the Government of Contractor-prepared drawings, and <br />placement of the reinforcement steel and embedded items, <br /> <br />4. Updates of the concrete placement subnetwork shall be submitted at the same <br />time as the updated construction program in accordance with Section 01321 _ <br />Construction Program, The update shall be the complete subnetwork and shall <br />show those elements of work completed, those underway, and the appropriate <br />revisions for future concrete placements. <br /> <br />5, After the Government has received the Contractor's concrete placement <br />subnetwork and the master concrete placement plan, a meeting will be arranged <br />between the COR and the Contractor to discuss specifications requirements for <br />concrete placement drawings and reinforcement detail drawings. <br /> <br />E, Shipping documents for cementitious materials. <br /> <br />I. Names and addresses of cement shipping points; cement manufacturers's, <br />contractors to whom the cement will be shipped if other than the prime <br />Contractor. <br /> <br />2, Quantity of cementitious materials ordered. <br /> <br />3. Whether cementitious materials will be ordered in bulk or in bags. <br /> <br />4, Purchase order number, contract number, or other designation identifying the <br />cement to be used, <br /> <br />5, Certification that material meets specified requirements. <br /> <br />6. Type or class of material including options. <br /> <br />7, Manufacturing location and dates, <br /> <br />8. Lot or bin number, <br /> <br />9, Shipment date, <br /> <br />F. Approval data for admixtures, <br /> <br />I, Manufacturer's brand names, including ASTM designation and type, for each <br />admixture, <br /> <br />2, Manufacturer's product description, instructions, recommended dosage, chloride <br />content, and precautions for use, <br /> <br />3, Independent laboratory testing data certifYing admixutres comply with designated <br />ASTM standards, <br /> <br />4, Concrete Coloring Admixture: Manufacturers brand names, instructions and <br />recommended dosages, and standard color chart for concrete coloring admixtures, <br /> <br />G, Curing compound <br />I, Purchase orders, <br />2. Manufacturer's certification, <br /> <br />Cast-in-P1ace Concrete <br />03300 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.