<br />Duranl!O Pumvine Plant - Staee 1 <br /> <br />002438 <br /> <br />C, American Concrete Institute (ACI) <br /> <br />1. <br />2, <br /> <br />ACI211R <br />ACI 309 R <br /> <br />Guide for Consolidation of Concrete <br /> <br />1.04 SUBMITTALS <br /> <br />A. Submit the following in accordance with Section 01330 - Submittals: <br /> <br />B. Master plan drawing showing all concrete placements, <br /> <br />C, <br /> <br />Individual concrete placement drawings showing locations, dimensions, blockouts,joint <br />types, finish to be used, openings, waterstops (including linear feet), and details of all <br />structural items embedded in or associated with the lift, except reinforcing steel. Submit <br />reinforcing steel details on a separate drawing corresponding to concrete placement <br />drawing. <br /> <br />I, Submitted concrete placement drawings must be approved by the Government <br />before submitting reinforcement drawings for approval. The Government will <br />require 25 calendar days for review of concrete placement drawings, and this <br />review time will apply to each separate submittal or resubmittal. <br /> <br />2, Overall size of drawings shall not exceed 22 by 34 inches unless otherwise <br />approved. <br /> <br />3, Drawings shall have a title block in lower right corner showing Contractor's <br />name; specifications number; description of placement; list of reference drawings <br />from which details shown on concrete placement drawing were obtained; and an <br />appropriate drawing number, <br /> <br />4. No concrete placements will be allowed without approved concrete placement <br />drawings, except as otherwise permitted by Contracting Officer. <br /> <br />5, Concrete quantities for each structure and/or placement shall be shown on the <br />placement drawings. <br /> <br />6. Drawings shall be clearly marked to identify the structure, section, and view. <br /> <br />( <br /> <br />D. Concrete Placement Subnetwork <br /> <br />I, As a separate subnetwork of the construction program required by Section 01321 <br />- Construction Program, include a complete, detailed concrete placement <br />subnetwork showing the Contractor's plans for placement of all the individual <br />features, units, and other elements of the concrete work required under these <br />specifications. <br /> <br />2, The concrete placement subnetwork shall be complete, prepared in accordance <br />with the construction program sections, and shall be in such form and detail as is <br />necessary to show the location, sequence, and date of the concrete placements <br />scheduled for each item of concrete work. <br /> <br />3. Details shown on the concrete placement subnetwork shall include the scheduling <br />of Contractor-prepared placement drawings, Contractor-prepared reinforcement <br /> <br />Cast-in-Place Concrete <br />03300 - 4 <br />