My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05314
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC05314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:43:16 AM
Creation date
10/9/2006 5:08:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
Rio Grande Basin-Rio Grande Basin River Basin Water Projects-San Luis Valley Project
Basin
Rio Grande
Water Division
3
Date
4/1/1952
Title
San Luis Valley Project Monthly Reports-1952
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Du.ring the month a safety inspection of Bureau. f'aoil1 ties at <br />Platoro wss oonducted by the Regional Safety Adv1eor with proJeot <br />pe1"sonnel. <br /> <br />The ProJeot ingineer conferred with members of the Chief Engineer's <br />staff in Denve1" 1'8gardil'lg proposals by. the II - S Products Con>. for <br />modi:f1cations of the valve operatil1ll mechanism at Platoro. It appea1"s <br />now that modification work can nct be acoolll~liah~d prior to 0109lng <br />dO>.ln operations for the. winter. <br /> <br />1ield work was inltiated.on the reconnaissanoe of the Conejos <br />water-shed for power potenUallt1ee 1R the area. Thls worl!: 11 pre- <br />limanary to the preparatlon of a report on the hydro-electrlc power <br />)Jotentials of the Rio Grande end the Consj09 Rlver. 'Pheu potentiah <br />are in addition to the proposed power development at Wagon Wheel Gap <br />as est forth in the ou.:oplemental report on tbe Rlo Orande Divislon. <br /> <br />Olosed Basin Division <br /> <br />During the month fl.eld and office work leading to the preparation <br />of a pro~ramreport Oft water ealvage features of the Division progree8ed <br />8atlsfaotori~. Field and offioe VCft leading to tJ:\e preparation of a <br />progrlllll report on power and irrigation potentials of the tributaries <br />was initiated during the mOllth. <br /> <br />A conferenoe lias held in Denver. Oolorado on September 29 to db- <br />CUll8 problems of water salv~e with officials of the Oeological Sun-ey. <br />The Projeot Engineer and the Planning ~ineer repre.ented the local <br />office. ?1he projeot's efforts 110 secure the services of a dralnaga <br />engineer from the U. 3. Salinity Laboratory wera outlined. A mseting <br />to dlBcuBG problema further was telltaUvel7 arranged tor early November. <br />Invitations to thh mfletlng1fill be given to the Regional Offioe. the <br />lIraill8ge Section of the Chief Engineer's Office lmI\ t<l the Ground Water <br />Branoh of the Geological Survey. <br /> <br />Measurements of ground water f'luotu.e.Uons were contiIl'O.ed during <br />the month by proJeot personnel. <br /> <br />General <br /> <br />A llIeeting of the Bowen OOllllllUn1ty'arm BureP.iO. was addreesed by the <br />projeot soil sclentist on the ~roblems of ~lk!\llnity and the cooperative <br />experimente now bel~ conducted. A eood ~ttendence was reali~ed with <br />many 'l.uestlcns allked by the water users. <br /> <br />The Regional Safety Advisor visited the proJeot to conduct inepeo-. <br />HOlls. show lIatety films end to demonstrate a new method of artificial <br />resuscitation whiob has been adopted by the Red Croes. <br /> <br />A safsty meeting wae held in the project office to emphaeize the <br />~angerG of driving in the farming lU'eas during the harvest seasotl. <br /> <br />ce,t <br />~~\~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.