Laserfiche WebLink
<br />San tuh ValleyproJeot <br />Monthly Report <br />September 1952 <br /> <br />l1eld rSoonnai8sanCt of potential power sites. in the Rio Grandt <br />dralnags above Del Norte. Colorado wasoontlnued during the month. <br />for several deys field WIlrk wall impossible due to olimaUc conditions. <br />The flrst snow of the winter fell at the higher elevations, turnlng <br />lnto 'l'ain below elev..t1on 9500 feet above sea level. <br /> <br />On September 11, 1952 the ProJect Engineer attended the re~lar <br />monthly llleetln;: of the Board of Direotors of the altn Luh Vallll\t. Water <br />Oonservancy.District. President Claus Thompson expressod a desire for <br />action on the part of the :Bu.reau of Recla_tion in epeeding UlI w01"k <br />prellnlinar:r to beginnill6 con<'lt ru.otion of Wagon Wheel Gap IlBlll and <br />Reservoir. Arrangements vere made for the ProJeot Engineer and <br />Mr. R. J. Moses, Attorney end Secreta17 to the Board of Direot01"8 to <br />go to Amarillo, ~exas on September 23 for a meeting with the Regional <br />Di'l'ector. Re6iOn 5. :Bu.reau of BecllllllaUon. 'l'hepurpose of the meet- <br />lIlt was to discuss the future steps to be taken by the District. aotions <br />to be aooomplished by the Burer.u. and to ~.!scuss attitudes of tho BoUd <br />on various subJeots pertaining to worlr on this DivIsion of the proJeot. <br /> <br />Ths meeting wae held on schedule and a draft of a propooed oontract <br />discusoed. for the purposes of discussion. & oop1 of the ConeJoB con- <br />traot wao used. Sflveral proposed changes were tentativelr a!;Teed. upon. <br />It was concluded that paragraphs }>~v1ng to do with Beroa". l1mitntion8 <br />would.be revIeed in aocordanoe with the amendment to the OoneJ08 contract <br />now being negotiated to include provisioas of recently adopted legislation. <br />!he conference w.s a maJor etell in an orderly pro.~;rem which hao as its <br />goal the conatruotion of l'Iacon Wheel Gap Darn. Reservoir ~.nd Power Plant. <br /> <br />011 September l6repreBentatives from Colorado A & IC Oo11el\"e vhited <br />the proJeot to oonduot 'he harvest 011. the experimental plots near Mosca, <br />Oolorado. He.rvellting was oompleted and the plots irrit;atBd. 5011 and <br />water samplee were taken dazin<< the month and Bent to the Salinity Labo- <br />1"&to17, Rlverside, Oalifornia for Sll8J.yses. <br /> <br />OonejoB Division <br /> <br />During the month negotiations in connection with the existing oon- <br />tract were oontinued. ~lene negotiations ooncerned the umending of the <br />contract to eliminate pa1"agl'aphe ooncerning acreage limitations and <br />substituting proYielons in aooordance wIth reoently adopted legislation. <br />At the end of the month all ohanges had been agreed upon and the pro- <br />posale submitted to the Seoretary ot the Interior for p1"ior Il.:p]:roval. <br /> <br />Miscellaneous work at Platoro Dam and Reservoir continued d=ing <br />the month. Work, under oontract, on the installation of culverh in <br />the nocese road progressed satisfnctorily. Other work aocomplishedinCluded drainage ohannel reotifioation at oulvert installations, ~ <br />velopment of 1"1p-rap for bank protection below the valve house, and <br />some minor channel work on the 1"iver near the gaging station. <br /> <br />001881 <br />