My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04844
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:41:13 AM
Creation date
10/9/2006 4:52:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Indian Water Rights Ute Tribes
State
CO
Basin
Statewide
Date
8/1/1986
Author
Boyle Engineering
Title
Agricultural Engineering Study Southern Ute and Ute Mountain Ute Indian Reservations San Juan Watershed Task D and E Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />II <br />II <br />I <br />II <br />I <br />. <br />I <br />. <br />II <br />I <br />'. <br />. <br />I <br />. <br />I <br />I <br /> <br />121'0 <br /> <br />SAN JUAN WATERSHED <br /> <br />TABLE 0.4 <br />SUMMARY OF OFF-FARM IRRIGATION WATER COST <br /> <br /> y 2/ Water Residual <br />,Parcel Gross Net pay.Cap-:- Cost Pay.Cap. <br />No. Acres Acres S/ac/yr S/ac/yr S/ac/yr <br />545 11 11 166 593 -427 <br />574 8 8 119 1174 -1055 <br />575 19 19 160 688 -528 <br />576 26 26 164 1100 -936 <br />578 18 18 157 500 -343 <br />579 8 8 119 298 -179 <br />580 14 14 147 201 -54 <br />581 6 6 105 343 -238 <br />582 31 31 166 198 -32 <br />583 8 8 105 298 -193 <br />584 10 10 136 257 -121 <br />585 10 10 136 233 -97 <br />586 31 31 166 261 -95 <br />587 9 9 126 266 -140 <br />588 14 14 147 606 -459 <br />589 36 36 168 266 -98 <br />590 265 259.7 169 114 553/ <br />591 28 28 192 174 18}/ <br />592 9 9 153 315 -162 <br />593 21 21 189 199 -10 <br /> <br />y <br /> <br />Parcel net acres for irrigation system resulting in the <br />highest payment capacity. See Appendix 0.1. <br /> <br />y <br />l/ <br /> <br />Highest preliminary payment capacity from Appendix 0.1. <br /> <br />Parcel with positive residual payment capacity. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.