My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04825
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:41:09 AM
Creation date
10/9/2006 4:52:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Title
Bethel Colondo Enhancement-CRDSS Task Order
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-'. .OJj'~2'3'4 <br />/ <br /> <br />;' .. <br /> <br />D,RAIT CRDSS Task Order <br /> <br />Task Order Title: Management Issue Support <br />Task Order Number~ <br />Consultant: Ross Bethel of Leonard Rice Consulting Engineers <br />Estimated Duration: February 1 through June 30, 1997 <br />Estimated Cost: $ 6,500 <br /> <br />The state desires technical assistance from Leonard Rice to provide engineering services related to <br />CROSS development. The following two task orders are being executed at the same time, <br />LR-I.., Management Issue Support <br />LR-2... Enhancements to Colorado River Water Resources Planning Model. <br />In the event that activities in these task orders compete for the available resources, LR-1 activities <br />will take precedence over those activities described in LR-2, As additional task orders are executed <br />those task orders will describe the priority of those activities in relation to activities in other on-going <br />task orders, These additional task orders may include the support of model development on the <br />Gunnison River and the development of scope for a pc-based consumptive use model. <br /> <br />SCQpe of Work <br />1. On verbal authorization of one or more CRDSS management team representatives. attend <br />CRDSS management team meetings which typically occur twice a month, ~ 1'/, __!j) I If / ~, <br />2, On verbal authorization of the CRDSS Project Manager, attend CRDSS TAC meetings, In <br />estimating cost it is assumed that the intent is to offer some continuity and history during the <br />T AC meeting and that little preparation for those meetings will be necessary.@are <br />expected to occur during the duration of this contract, <br />3, Provide information requested by CRDSS management team representatives related to <br />CRDSS past and planned development, , <br />4, Provide a monthly invoice and progress report which describe activities performed for all task <br />orders, <br /> <br />Deliverables' <br />Input to CRDSS development process, Others undefined, <br /> <br />32 hours @ $ 82/hour = $ 2600 <br />8 hours @ $ 82/hour= $ 650 <br />24 hours @ $ 82/hour= $ 2000 <br />8 hours @ $ 82 hour= $ 650 <br />Total Estimated Cost= $ 6,500 <br />If during the duration of this task order, costs appear to be inconsistent with the above estimates, then <br />a course of action will be decided on by CRDSS management and Mr, Bethel. The above estimates <br />work out to an equivalent of about 14 hours per month <br /> <br />Estimated Cost: <br /> <br />Task 1 <br />Task 2 <br />Task 3 <br />Task 4 <br /> <br />/ff 4v/",,,, <br /> <br />Estimated Duration: <br />From February 1, 1997 through June 30, 1997, <br />
The URL can be used to link to this page
Your browser does not support the video tag.