<br />OOZ2~3 <br />All, <br /> <br />~ <br /> <br />Task 2a5 8 hours @ $ 82/hr= <br />Task 2a6 4 hours @ $ 82/hr= <br />Total approximate subtask cost <br /> <br />$ 650 <br />$ 330 <br />$3,590 <br /> <br />Schedule: <br />Given Mr. Bethel's 20 hour per week time commitment to the CRDSS Project, it is <br />anticipated that the above work would be performed over the course of 3 weeks from March <br />10 through March 28 in concert with activities by CWCB staff <br /> <br />Subtask LR-2b Reservoir Operations Modifications to Baseline Scenario <br /> <br />Obiective: <br /> <br />ModifY the "baseline" scenario input files for the Phase II Colorado River water <br />resources model to reflect similar changes that were made to the calculated scenario <br />in subtask 2a above. Document the modifications made to the Baseline scenario. <br /> <br />Note: No changes are anticipated to be made to the "historic" run in which the reservoirs were <br />operated with historic volume targets, <br /> <br />Scope of Work <br />2b.1 ModifY the "baseline" model's input data (in the base model data directories on cando) to <br />reflect the agreed on operating rules (from subtask 2a), It is anticipated that modifications <br />to the statemod program would not be necessary and that changes would only be made to the <br />"baseline" scenario input data for the model. Rerun the baseline scenario. <br />2b.2 In draft form, modifY (redline) existing Phase II documentation to reflect changes in <br />methodology, assumptions and results resulting from this task. Emphasis will be on both <br />streamflow below the reservoirs and the reservoir contents. <br />2b.3 After receiving CRDSS/CWCB comments of the draft task documentation, finalize the <br />modifications to the Phase II documentation to present the results of this task. <br /> <br />Deliverables (referencing subtask identifiers): <br />2b I Modified "baseline" scenario input data for the 16 reservoirs in the Colorado River <br />Basin model reflecting changes agreed on with the CRDSS management team, <br />2b2&2b3 Draft and final documentation of the subtask through modifications to the Phase II <br />documentation. <br /> <br />Cost Estimate: <br />Task 2bl 4 hours @ $82/hr = $ 330 <br />Task 2b2 4 hours @ $ 82/hr = $ 330 <br />Task 2b3 4 hours @ $ 82/hr= $ 330 <br />Total Approximate Subtask Cost $ 990 <br /> <br />3 <br />