My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04788
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:41:00 AM
Creation date
10/9/2006 4:49:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.650
Description
Wild and Scenic - Yampa River
State
CO
Basin
Statewide
Date
1/1/3000
Author
Unknown
Title
Materials Employed for the Social Conflict Analysis of the Yampa and Green Wild and Scenic Rivers Planning Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002223 <br /> <br />So, please stnrt with ISSUE II. Place a Map Board in <br />front of you, and write Issue #1 in the S!'ilCC provIded. <br />Next,. please indicate which position you believe groups <br />or oI'eanizntions in each social category llave taken on <br />that issue and hO\.] important in your judgment that issue <br />is to organizations within each social category. Record <br />your estimates on your Issues Tab Sheet. <br /> <br />Next, label a new Map Board Issue 12, and proceed in <br />the same manner as with Issue Ill. Proceed in this <br />manner until you have rendered your best estimates <br />for each of the issues. <br /> <br />You have examined the issues which were determined to <br />be of major importance by spokesmen for the planning <br />area. If you feel that there are additional issues <br />of major importance, please write them in on the Tab <br />Sheet, in the space provided for Issues 5 to 7, and <br />state reasons why you deem them important. <br /> <br />The results of this first phase is to determine the <br />existing conflict patterns within the planning area. <br />This establishes a base against which Management <br />Alternatives are measured for the effects on the <br />existing conflict pattersn. <br /> <br />5 <br /> <br />Start <br />with <br />Issue III <br /> <br />go to <br />Issue 1/2 <br /> <br />extra <br />issues <br /> <br />i <br />, <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.