Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br /> Table 4 <br /> Bureau of Reclamation Salinity Control Unit Summary <br /> Salt Potential Expenditure Total Annual <br /> raooved Salt thru Capital O&H Cost <br /> J thru FY93 removal FY93 Cost Costs Effectiveness Q <br />Unit/Study I.p1......tation (tons/yr) (tons/yr) ($I000's) ($1000's) ($1000's) ($/ton) C <br /> Q .' <br /> - -.J <br /> UNITS UNOER CONSTRUCTION OR COMPLETEO ~ <br />Meeker Dome 1980-1983 48,000 48,000 3,100 3,100 0 5 "" <br />las Vegas 1978-1985 3,800 3,800 1,757 1,757 50 51 <br />Pi ttman Bypass <br />Grand Va 11 ey 1980-1998 85,766 131,300 123,139 159,116 432 102 <br />Paradox Valley 1988-1995 Testl n9 128,000 62,425 67,425 3,500 77 <br />Dolores Project 1990-1997 constr. 23,000 29,290 38,524 33 138 <br />Lower Gunnison 1991-1995 constr. 41,380 18,413 24,819 416 58 <br />Wi nter Water <br />Subtota 1 137,659 375,480 237,124 293,741 3,431 73 <br /> UNITS UNDER INVESTIGATION <br />San Juan-Hammond pend; n9 0 27,700 0 11,697 0 34 <br /> authorization <br />Price-San Rafael pendi ng 0 161,000 0 77 ,711 0 39 <br /> authorization <br />l. Gunnison pend; ng 0 64,000 0 53,178 0 68 <br />East Side lats cei 1 ing <br /> authorization <br />Ui nta Basi n pendi ng 0 25,500 0 28,973 0 93' <br /> authorization <br />Glenwood Springs (private) planning 0 72,pOO 0 0 8,000 111 <br />Subtotal 0 350,200 0 171,559 8,000 63 <br /> PROGRAM TOTAlS <br />Total 137,659 725,680 237,124 465,300 11,431 68 <br />'local implementation would reduce costs by up to 40 percent. <br /> <br />33 <br />