<br />Table 3
<br />
<br />Summary of Basin Fund Transfers for Repayment of Salinity Control Program ($l,OOO'sl
<br />
<br />FY .~~ lower Lower Grand Grand Paradox Las
<br />and Dolores Do 1 ores Gunnison Gunnison Valley Valley Valley Vegas USDA Program
<br />Fund Constr. O&M Canst r. O&M Constr. O&M O&M Wash Total Total
<br />FY -87 UB 3,071 2,013 4,905 9,989
<br />FY-87 LB 17,402 11,410 27,797 56,609
<br />FY-B8 U8 -3,071 2,545 972 86,570 87,016
<br />FY-88 L8 160,515 14,424 5,511 490,562 671,012
<br />FY -89 U8 29,124 914 4,454 105,163 139,655
<br />FY-89 L8 176,194 165,039 5,178 25,242 595,923 967,576
<br />FY-90 L8 685,579 683,908 165,366 20,826 40,743 827,734 2,424,156
<br />FY-91 LB 1,022,056 12,857 1,018,031 167,566 24,461 54,736 1,041,545 3,341,252
<br />FY-92 LB 1,791,857 13,151 1,800,250 58,374 201,706 25,037 100,304 1,511,481 5,502,160
<br />FY-93 LB 3,508,286 29,635 1,481,236 62,335 269,810 62,403 90,727 36,690 2,312,460 7,853,582
<br />Totals 7,361,889 55,643 4,983,425 120,709 1,029,003 138,819 322,689 36,690 7,004,140 21,053,007
<br />
<br />Notes: UB - upper basin fund, LB - lower basin fund
<br />
<br />Grand Valley, Las Vegas Wash, and Paradox construction costs are repaid by. the Upper and Lower Basin Funds over 50 yrs from the time the
<br />separable feature begins operation, O&M costs are repaid the following year or are charged interest.
<br />
<br />Dolores, Lower Gunnison, and USDA projects repay from the Lower Basin Fund as the costs are incurred for both O&M and construction or
<br />are charged interest. Repayment from the Upper Basin Fund will be within 50 years from the time operation begins,
<br />
<br />No payments have been made from Upper Basin due to unpaid interest on CRSP investment since FY -90.