My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04560
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:02 AM
Creation date
10/9/2006 4:40:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
Colorado River Water Projects - Colorado River Storage Project - CRSP - Publications
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1971
Author
Unknown
Title
Project Reports-Summaries-Descriptions - West Divide Project - CRSP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />,- <br /> <br />0005'>2 <br /> <br />. <br /> <br />The amount of time required for the advance planning work <br /> <br />will depend on how the work is funded. If adequate funds are avaii- <br /> <br />able, it is anticipated that the advance planning work can be completed <br /> <br />in a two or three year period. <br /> <br />Project Construction <br /> <br />A period of about 6 to' 8 years may be required for the actual <br /> <br />construction work because of timing on the 14 miles of tunnel. The <br /> <br />work could require an even longer period if stage construction is <br /> <br />found to be desirable. <br /> <br />I: <br /> <br />,- <br />I <br />, <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.