My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04560
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:02 AM
Creation date
10/9/2006 4:40:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
Colorado River Water Projects - Colorado River Storage Project - CRSP - Publications
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1971
Author
Unknown
Title
Project Reports-Summaries-Descriptions - West Divide Project - CRSP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'-. <br /> <br />0005"1 <br />0., <br /> <br />. <br /> <br />One of the alternative routes for conveying water from <br /> <br />Crystal River to West Divide Creek would involve a canal that would <br /> <br />pass through the Thompson Creek, Garfield Creek and East Divide Creek <br /> <br />areas. This canal would: (1) provide a means of water service for the <br /> <br />Thompson Creek area that would be an alternative to. the Yank ,Creek;, <br /> <br />Reservoir - Fourmile Canal system included in the present plan; <br />, <br /> <br />(2) consider the needs for municipal and domestic water for the <br /> <br />Garfield Creek area that will not receive project w~ter nnder the <br /> <br />,present plan; and (3) serve as alternative to East Divide Canal in <br /> <br />providing service for the East Divide Creek area. <br /> <br />This alternative was considered in previous planning work <br /> <br />but merits further consideration because of changes in anticipated <br /> <br />water needs, and changes in construction methods and costs. <br /> <br />Further study will be made of storage sit,es on West Divide <br /> <br />Creek both as alternative and as additions to the Haystack Reservoir <br /> <br />site. These studies will be correlated to the evaluation of the <br /> <br />alternative Crystal River-West Divide Creek routes. <br /> <br />The requirements and time of need for municipal and industrial <br /> <br />water will be reanalysed and consideration will be given to possible <br /> <br />stage development of the project to conform with projected water needs. <br /> <br />Environment effects of the project will be evaluated and an <br /> <br />environmental statement prepared. Past comments made by a few individ- <br /> <br />uals and groups indicate that there will bQ at least some opposition'to <br /> <br />Placita Reservoir by environmental groups. There may also be objections <br /> <br />to some of the canal routes planned for the project. <br /> <br />i <br />[- <br />l <br />f. <br />. <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.