My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04555
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:00 AM
Creation date
10/9/2006 4:40:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/30/1997
Title
BEC IIIb-Div 5 Worksheets-Data Extensions-Contingency Authorizations-Exhibit E Phase IIIb Boyle Engineering Corp Administration Tool Scope of Services
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />· Methods for water users to access information. <br />· Links to the Administration tool being developed under the RTi contract. <br /> <br />3.2.Draft Conceptual Design Incorporate State comments into a Draft Conceptual Design <br />Memorandum. Distribute to members of the Colorado River Surface Water Accounting Team <br />(SWAT Team). <br /> <br />Deliverables: <br /> <br />I. Preliminary Conceptual Design Memorandum <br /> <br />2. Draft Conceptual Design Memorandum <br /> <br />Task 4 - Water User Review and Final Conceptual Design <br /> <br />Responsibility: Boyle <br /> <br />Objective: Solicit and include water user review and comments on the Draft Conceptual Design <br />into a Final Conccptual Design. <br /> <br />Approach: <br /> <br />4.I.SWAT Team Workshop Conduct one (I) half day workshop with the SWAT Team. The <br />workshop will occur approximately two weeks after the conceptual design has been distributed <br />to Team members. At the workshop, the Draft Conceptual Design will be presented and <br />reviewed. SWAT Team comments and suggestions will be solicited and documented in a <br />memorandum. <br /> <br />4.2.Coordination Meetings Prepare for and attend individual coordination meetings with key <br />Division 5 water users. The purpose of these meetings will be to identify specific concerns and <br />issues, and to facilitate integration of water user project accounting sheets into the Division 5 <br />Worksheet. Specific considerations or issues associated with these individual users will be <br />identified and documented in meeting minutes. It is anticipated that eight (8) 2-4 hour meetings <br />will occur with the following agencies: USBR, Northern Colorado Water Conservancy District, <br />Colorado Water Conservation Board, Colorado River Water Conservation District, Denver <br />Water Board, Southeastern Colorado Water Conservancy District, Grand Valley Water Users <br />and Colorado Springs <br /> <br />4.3.0ther Coordination Contacts Other key water users (such as Clinton Reservoir Company, <br />Shoshone Power Plant etc.) will be contacted via telephone and documented in order to facilitate <br />input regarding the system design, and to determine special requirements of individual water <br />users. Other contacts will be documented in phone minutes. <br /> <br />4.4.Final Conceptual Design Incorporate comments obtained in previous subtasks into a Final <br />Conceptual Design Memorandum. Distribute to State and members of the Colorado River <br />Surface Water Accounting Team (SWAT Team). Incorporate meeting and phone minutes as <br />an appendix. <br /> <br />Deliverables: <br /> <br />1. SWAT Team workshop. <br /> <br />03;>>0 <br /> <br />c: Iwlcrdsslscopelboy IIIblcrdss3 .doc <br /> <br />5/30/97 " Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.