My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04555
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:40:00 AM
Creation date
10/9/2006 4:40:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/30/1997
Title
BEC IIIb-Div 5 Worksheets-Data Extensions-Contingency Authorizations-Exhibit E Phase IIIb Boyle Engineering Corp Administration Tool Scope of Services
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />methods of determining the quantity of Green Mountain Reservoir replacement water releases <br />will be evaluated. <br /> <br />2.4.Water User Accounting Information Water user spreadsheets and other accounting <br />information currently or expected to be provided by water users to Division 5 will be reviewed. <br />Material to be reviewed will include spreadsheets maintained by Denver Water, the Northern <br />Colorado Water Conservancy District and other major water users. <br /> <br />2.5.CRDSS Planning Model Data Water facility descriptions developed as part of the CRDSS <br />planning models will be reviewed and evaluated. These include descriptions of major systems <br />on the Colorado River Basin such as the Colorado Big Thompson, Denver Water Board, <br />Frying Pan Arkansas, etc. <br /> <br />2.6.Draft Review A memorandum will be prepared which summarizes how the reviews <br />conducted in the subtasks above are relevant to the Division 5 Worksheet. <br /> <br />2.7.Final Review Memo Incorporate State comments into a Final Review memorandum. <br /> <br />Deliverables: <br /> <br />I. Draft Review memorandum <br />2. Final Review memorandum <br /> <br />Task 3 - Preliminary and Draft Conceptual Design <br /> <br />Responsibility: Boyle <br /> <br />Objective: Develop a Preliminary and Draft Conceptual design for the Division 5 Worksheet. <br /> <br />Approach: <br /> <br />3.I.Preliminary Conceptual System Design A Preliminary Conceptual Design for a Division 5 <br />Worksheet will be developed based on local knowledge and the information developed in <br />previous Tasks. The conceptual design will be coordinated with the Division 5 Engineer, <br />CRDSS project manager and CWCB representatives. It will be documented in a memorandum <br />containing approximately 10 pages of text and distributed to the State for review. Expected to <br />look similar to Figure 1 and Table 1, this preliminary conceptual design will identify program <br />specifications such as: <br /> <br />· Excel operating under Windows 95 is the recommended software and operating system. <br />. Summary Worksheet content. <br />· Number of Backup Spreadsheets to be broken out from the existing CRA Spreadsheet. <br />· Number of New Backup Spreadsheets to be developed. <br />. Existing water user spreadsheets to be included. <br />· Calculation sequence. Note it is understood there are currently two approaches to operating <br />the river; one based on real time stream flow measurements and another based on natural flow <br />calculations. One or more calculation sequences will be recommended for implementation. <br />. Communication between the spreadsheets. <br />· The manner in which information will be transferred between spreadsheets, <br /> <br />C:\w\crdss\scope\boyIIIb\crdss3.doc <br /> <br />l<;f:O <br /> <br />5/30/97 - Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.