<br />, <br /> <br />; <br /> <br />O('jnb~~ <br /> <br />e. Completion ofNNMP is projected to be delayed from Fall 2009 to Summer 2011; a delay <br />of approximately one and three-quarter (1 %) years. <br /> <br />f. Completion of the Permanent Operating Facility is projected to be delayed from Fall 2009 <br />to Summer 2010; a delay of approximately three-quarters (3/4) of a year. <br /> <br />Bearing in mind the preceding discussions, this update shows that activities are progressing at a rate <br />which will maintain the overall project float established to manage the project. The following table <br />summarizes overall project progress: <br /> <br />Established Project "Construction Complete" Date <br />Goal: Maintain six (6) months project float <br />Benchmark Project "ALP Construction Complete" Date <br /> <br />January 20, 2012 <br /> <br />July 20, 2011 <br /> <br />Current Schedule "All ALP Construction Complete" Date (see sheet 11 of 11) <br />Previous Update (July 2005) "All ALP Construction Complete" Date <br /> <br />July 20, 20 II <br />July 20. 2010 <br /> <br />The term "Benchmark Project Construction Complete Date" reflects the Established Project <br />Construction Complete Date of January 20,2012, less six (6) months of project float. Please note <br />that float is, in essence, computed based on the Current Schedule "All ALP Construction <br />Completion" date for construction activities. <br /> <br />The schedule has been updated to reflect the actual dates for construction contract activities, non- <br />construction activities, and environmental & archaeological work activities. This update maintains <br />the Durango Pumping Plant and Ridges Basin Dam as high priority work, as we consider these <br />features to be the project's highest risk work, <br /> <br />Any activity on the schedule related to fish monitoring, environmental monitoring, or non-contract <br />costs will show negative float. This is because these activities extend beyond the completion of <br />feature construction activities, Particularly, environmental monitoring items such as the "Animas <br />River Monitoring in FYI1-FYI4" (Activity FW530) generates the Project Schedule Finish Date of <br />September 29,2014, <br /> <br />II. Logic Changes. <br /> <br />A. Minor logic changes and updates made under the RBIC Stage #2 Conceptual Design activities. <br />The updated and projected completion date is Winter 2008, which is approximately four (4) <br />months earlier than the previous schedule update. <br /> <br />B. The duration for the dam embankment construction work from original ground to dam crest <br />(Activity RB 1240) was increased to reflect production using a single shift construction <br />operation in order to reduce the funding level required to sustain double shifts, <br /> <br />III. Other Changes, <br /> <br />A. Navajo Nation Municipal Pipeline has constrained start dates for the award of several contracts <br />as follows in order to correlate the anticipated funding levels: <br /> <br />a. Award of Direction Drilling Contract <br /> <br />Constrained to <br /> <br />December 2008 <br /> <br />2 <br />