My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04550
CWCB
>
Water Supply Protection
>
Backfile
>
18000-18999
>
WSPC04550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:39:59 AM
Creation date
10/9/2006 4:40:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.H
Description
Colorado River Water Projects - Animas La Plata - Operation Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/2/2005
Author
ALP-PCC
Title
Animas La Plata Project Construction Activities and Schedules - Master Project Schedules - November 2005-February 2006 - 12-02-05 and 02-15-06
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />>~ .. <br /> <br />OiHlG33 <br /> <br />ANIMAS-LA PLATA PROJECT (ALP) <br />SCHEDULE UPDATE - NOVEMBER 2005 <br />SUMMARY NARRATIVE <br /> <br />I. GeneraL The ALP Project Schedule has been updated to November 1, 2005 with significant <br />considerations made to current funding levels, Since the 2003 Construction Cost Estimate (CCE), <br />the Project schedules have been updated based upon what was thought to be a Teasonable funding <br />level for the Project activities. However, based upon recent appropriated amounts, it is clear the <br />assumptions used for the previous funding driven schedules were unrealistic and need to be updated <br />as welL This problematic need is compounded by recent effects of high inflation for key Project <br />components (such as steel, fuel, and cement). <br /> <br />In order to account for the uncertainty of future appropriations, as Reclamation has announced, the <br />ALP Project Schedule will be updated at least twice per year. Specifically, the Project schedule will <br />be updated when the President presents the budget to Congress in February. and again when <br />Congress passes the annual appropriations bill for each fiscal year. This will provide a successive <br />understanding of the ALP Project as related to the funding stream, Periodic updates will occur <br />should any significant changes be necessary, <br /> <br />Currently, on November 20, 2005, the President signed the FY2006 budget. Therefore. the attached <br />Project schedule is presented based upon that funding level. <br /> <br />We stress that should actual expenditures be less than anticipated and/or future appropriations <br />levels be higher, the Project activities are designed that, within reason, work can be completed <br />ahead of the projections being presented herein. However, the opposite corollary is true also, <br />Therefore, caution should be used to plan specific work activities presented within this schedule, <br />We advise, should individuals or organizations require schedule related decisions be made for <br />planning purposes, the related specific activities should be discussed with this office prior to <br />finalizing those decisions, <br /> <br />It can be expected added Project costs will result from the following schedule delays. Contingency <br />plans to avoid or minimize these delays are being formulated. The significant update adjustments <br />which were made since the previously published Project schedule (in July 2005) are: <br /> <br />a, Completion of Project Construction is projected to be delayed from Summer 2010 to <br />Winter 2012; a delay of approximately one and one-half (1 Y2) years. <br /> <br />b. Completion of the Ridges Basin Dam is projected to be delayed from Summer 2008 to <br />Summer 2009; a delay of approximately one (1) year. <br /> <br />c. Completion of the Durango Pumping Plant is projected to be delayed from Winter 2009 to <br />Summer 2009; a delay of approximately one-half (112) of a year. <br /> <br />d. Completion of Reservoir First Fill is projected to be delayed from Fall 2010 to Summer <br />2011; a delay of approximately three-quarters (3/4) oCa year. However, the Start of the <br />First Fill remains unchanged at Summer 2009. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.