Laserfiche WebLink
<br />;/ <br /> <br />Testing Software changes to both Low level DMI's and DMI Utilities will be conducted <br />as follows: <br />· Software which access both the CROSS and HB - CROSS databases will be <br />compared for all command line options using a defined data set (one water district, <br />basin, or division), The data set will be selected randomly in concert with the State, <br />· Differences will be identified and resolved, <br />· A memo will be prepared documenting the testing procedures and results, <br /> <br />The above procedure is estimated to be adequate to assure but not guarantee that the <br />revised software produces the same results as the existing CROSS software, RTi will <br />resolve any differences which result from additional checks performed by the State and <br />reported to RTi within 2 weeks of the projected completion date, <br /> <br />Documentation Because the functionality of the software being revised in this Task is <br />not expected to change, little impact to existing documentation is expected, R Ti will <br />review and revise all existing CROSS documentation, including the User's Manual, <br />Developers Manuel, and man pages which may be impacted by this task, <br /> <br />Deliverables <br />RTi will provide: <br />I, Revised Low - Level DMI Routines that access the HB - CROSS database, <br />2. Revised DMI Utilities that access the HB - CRDSS database, <br />3, Task memorandum documenting the testing procedures and results performed in this <br />Task, This memorandum is expected to contain approximately 15 pages, <br />4, Revised documentation, if necessary, including (User's Manual, Developer's Manual <br />and man pages), <br /> <br />Task R7 - Documentation and Delivery <br /> <br />Approach <br />Tasks R2, R3, R4 and R5 contain new sections to be added to the existing CROSS <br />documentation, Additional documentation to be performed in this Task include: <br />· Miscellaneous edits to the Database section of the CROSS Developer's Manual to <br />reflect the HB-CROSS design, <br />· Miscellaneous edits to the CROSS User's Manual to reflect the HB-CROSS design, <br />· Delivery of the HB-CROSS database to the central HydroBase server maintained by <br />the State, Delivery may be as a database-unload to a tape, or the R Ti may physically <br />hand the whole development machine to the State representatives, <br /> <br />Deliverable <br />I. Revised CROSS Developer's Manual Database Section including: <br />· Replace all references to the CROSS database with HydroBase, <br />· Delete Section 3,0, Relationship ofCRDSS to HydroBase, <br />· New section representing the results of Task R2, Database Pseudo Code, <br /> <br />0<3'(..'7 <br /> <br />Scope of Work. HB - CRDSS, 12111/96 <br /> <br />9 <br />