Laserfiche WebLink
<br />:: : <br /> <br />. New section representing the results of Task R3, Database Creation, <br />. New section representing the results of Task R4, DWR Data Population, <br />. New section representing the results of Task R5, Non - DWR data population, <br />. Modified sections for the following; <br />. 2.1 Design Strategy <br />. 2.2 Design Objectives, particularly 2,2.4,1 Database Storage, <br />Requirements, 2,2.4 ,2 Non-relational Storage Requirements, 2,2.5 <br />User Access, 2,2,6 Maintenance and Support <br />. Replace the Entity-Relationship Diagram with Exhibit 1, <br />. A Data Dictionary (Entity and Attribute Definitions) <br /> <br />2, Revised User's Manuat The CRDSS User's Manual from Phase 11 should contain; <br />. Modified version of the User's Manual Database Section, <br />3, Delivery ofthe HB-CRDSS database to the State, <br /> <br />Task R8 - Contingency <br /> <br />Approach <br />This task contains activities which cannot be anticipated at this time, RTi will perform <br />no work in this task unless authorized in writing by the State, Following is one of several <br />potential activities to be performed in this Task, ~ \\ ? <br /> <br />Platform Change Tasks RI-R7 assume all work will be formed for use on an existing <br />Silicon Graphics, UNIX platform, running Informix, ently the State is evaluating the <br />potential benefit of changing to a Windows NT platfi Selection of a platform will be <br />made by the State to RTi in writing 3 days before R l' scheduled date to be in Task <br />3 - Create Database, If Windows NT is not recom n y the State, no work will be <br />performed in this task. If Windows NT is recommended by the State, the labor cost <br />associated with this selection will be charged to this task up to the amount budgeted, <br />Note the budget for this task does not include any costs associated with purchasing <br />computer hardware, <br /> <br />Deliverable <br />Deliverables for this Task will be negotiated as activities are identified and mutually <br />agreed upon by both RTi and the State, <br /> <br />Assumptions and Conditions <br />There are a number of assumptions that must be met for the RTi to produce the <br />deliverables mentioned above, on schedule, on budget, and in a manner which satisfies or <br />exceeds the State's objectives, These assumptions are as follows: <br /> <br />. RTi will perform no modifications to the final design (Exhibit 1), unless expressly <br />authorized in writing by the CRDSS project manager, These changes will be <br />considered out ofthe present scope and the funds for these changes must be <br /> <br />Scope of Work, HB - CRDSS, 12/11/96 <br /> <br />092010 <br /> <br />