Laserfiche WebLink
<br />.. <br />001749 <br /> <br />,< <br /> <br />.1'1". <br /> <br />-3-- <br /> <br />5 EDgineeriag Aides <br />1 Clerk <br />1 Clerk-Typist- <br />S Laborers <br /> <br />'A'EA1'HER <br /> <br />The weather during the month was sufficiently severe to hamper <br />field activities. <br /> <br />~ <br /> <br />-, <br /> <br />PLANS FOR COMIJfG MONTH <br /> <br />;1 <br />~ <br /> <br />The project activities will be largely centered on office <br />studies.in connection with the Oonejos Division such as: develop- <br />ment of plans, conferences with Fish and Wildlife Service and <br />National Park Service, continuation of water supply studies. For <br />the Olosed llasin Division field surveys will continue and the recom- <br />mended studies w111 be initiated. A detailed study of land holdiu,gs <br />for the Couejos and. Rio Grande Division will be prepared. for the <br />Colorado Water Conservation Board. <br /> <br />~~~ <br />D. M. orester <br />Projeot EDgineer <br />Bureau of Reclamation <br /> <br />I~ <br />~ <br /> <br />-~ <br /> <br />, <br />, <br />I <br />I <br /> <br />I <br />i <br />, <br />