Laserfiche WebLink
<br />I <br /> <br />0017~7 <br /> <br />'1 <br /> <br />\ <br /> <br />--2-- <br /> <br />actively engaged in cirCtlla.ting a counter petition and probably with <br />considerable success. <br /> <br />CLOSED BASIN DIVISION <br /> <br />An automatic stream gags recorder was installed on Sand Creek. <br /> <br />EstabUshment of leval control for future installation of test <br />and observation wslls in the 8UIlIP area, as recommended by the Closed <br />lias in Drain Advisory COllllllittee. was begun during the month. <br /> <br />Additional recommended studies and investigations will probably <br />be gotten under way durillg January. <br /> <br />WEMINUCHE DIVISION <br /> <br />No activities other than routine stream gaging. <br /> <br />A review of water supply studies will be initiated as personnel <br />becomes available. <br /> <br />SAN JtIAN - SA1i LUIS PllOJECT mvESTIGATIONS <br /> <br />Field reconnaissance surveys to ascertain the engineering <br />problems involved in dlvertillg water from the PiedraR1ver to tne <br />Eio Grande Basin were suspended December 15 because of weather con- <br />ditions. <br /> <br />Field work will be resumed as early as poeeible this next <br />spring. <br /> <br />GEBEllAL <br /> <br />NothiDg to report. <br /> <br />ORG.Al'1IZATION.Al'1D PERSOmlEL <br /> <br />The project forces during December, 1945, were: <br /> <br />1 Project Engineer <br />2 Engineers, Field Engineering.and Surveys <br />1 Engineer, HYdrologic <br />2 Soils Technologists <br />