Laserfiche WebLink
<br />. , <br /> <br />Draft <br /> <br />- ., <br />Revision RIVER BASIN9~12 <br />. Attachment 1 ' <br />. <br /> <br />-2- <br /> <br />e <br /> <br />2, The Administrator notifies the appropriate state conservationist <br />by memo when the application is approved. The state conservationist <br />is designated as Field Advisory Committee Chairman and fuMed to develop <br />a Plan of Work. Economic Research Service (ERS) and Forest Service (FS) <br /> <br />representatives to the FAC are designated and funded by their agencies <br />to help prepare the POW, <br /> <br />3, The preliminary draft POW is prepared in conjunction with all agency <br />participants. This initial POW includes an outline of work with at <br />least the first phase of the study in detail. TSC assistance is pro- <br />vided as requested for preparing the POW. <br /> <br />e <br /> <br />4, The POW preliminary draft is reviewed by FAC members and the TSC, <br /> <br />5, The POW draft is approved by FAC. <br /> <br />6. The WAC reviews and comments - 45 days. (Send seven copies to the <br />River Basins Division and two to the TSC.) <br /> <br />7, The FAC completes the final POW and submits it to the WAC. (Send <br /> <br />seven copies to the River Basins Division and two to the TSC.) <br /> <br />8. The SCS Administrator authorizes the study based upon a final POW. <br /> <br />e <br /> <br />