My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04420
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:39:22 AM
Creation date
10/9/2006 4:36:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8507
Description
River Basin General Publications
State
CO
Basin
Rio Grande
Water Division
3
Date
8/6/1976
Title
Guidelines for Preparation and Content of Cooperative Basin Study Plan of Work (Draft)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. , <br /> <br />Draft <br /> <br />- ., <br />Revision RIVER BASIN9~12 <br />. Attachment 1 ' <br />. <br /> <br />-2- <br /> <br />e <br /> <br />2, The Administrator notifies the appropriate state conservationist <br />by memo when the application is approved. The state conservationist <br />is designated as Field Advisory Committee Chairman and fuMed to develop <br />a Plan of Work. Economic Research Service (ERS) and Forest Service (FS) <br /> <br />representatives to the FAC are designated and funded by their agencies <br />to help prepare the POW, <br /> <br />3, The preliminary draft POW is prepared in conjunction with all agency <br />participants. This initial POW includes an outline of work with at <br />least the first phase of the study in detail. TSC assistance is pro- <br />vided as requested for preparing the POW. <br /> <br />e <br /> <br />4, The POW preliminary draft is reviewed by FAC members and the TSC, <br /> <br />5, The POW draft is approved by FAC. <br /> <br />6. The WAC reviews and comments - 45 days. (Send seven copies to the <br />River Basins Division and two to the TSC.) <br /> <br />7, The FAC completes the final POW and submits it to the WAC. (Send <br /> <br />seven copies to the River Basins Division and two to the TSC.) <br /> <br />8. The SCS Administrator authorizes the study based upon a final POW. <br /> <br />e <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.