My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04324
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:38:55 AM
Creation date
10/9/2006 4:33:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8402.400.10
Description
Platte River Basin-River Basin Basic Hydrology-Transmountain Diversions Imports-Blue South Platte
State
CO
Basin
South Platte
Water Division
1
Date
8/29/1946
Author
Jean S Breitenstein
Title
Blue South Platte Project 1942-1955-Review of Statements of Claim Regarding General Adjudications in Water District 36
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Page #3 <br /> <br />dates the claims of United States state: <br /> <br />"Claim is hereby made of a priority right <br />as of April 17, 1936 or as of 3une 9, 1938 <br />pending on the final determination whether <br />the date of priority is to the date of begin- <br />ning of surveyor the date of beginning of <br />construction work" " "". <br /> <br />4. The statement of the South Platte Water Users <br />Association obviously cla'ims all water claimed by Denver <br />plus additional water to be made available by feeder canals <br />intercepting at elevation 9,013 feet water not naturally <br />tributary to the Blue River above the Dillon Reservoir. <br /> <br />5. Under Senate Document 80 the minimum obligation <br />of the United States is (a) replacement storage of 52,000 <br />a.f. at Green Mountain with reasonable expectancy that <br />it will fill annually, and (b) the maintenance from <br />April 15 to October 15 annually of a minimum flow of <br />1,250 c.f.s. at Shoshone. <br /> <br />6. An engineering study should be made to determine <br />the effect of the depletion of the stream by the taking of <br />1600 c.f.s. at the Dillon Reservoir site under the allegedly <br />senior claim of Denver upon the operation of Green Mountain <br />and the ability of the United States to satisfy the minimum <br />obligations stated above. <br /> <br />7. In the event the suggested engineering study shows <br />an adequate water supply to satisfy the stated minimum <br />obligations of the United States, then it would seem that <br />an amicable adjustment may be made between Denver and the <br />United States provided that (a) proper arrangement may be <br />made for the exchange of power generation facilities on the <br />east slope for those at Green ].1ountain, and (b) an under- <br />standing can be reached as to the supplying of Colorado <br />deficiencies in river flow at Lee Ferry. <br /> <br />8. The claim of the South Platte Water Users Associ- <br />ation, being admittedly junior to both the United States <br />and Denver claims, can apply only to water available after <br />such senior claims are satisfied. <br /> <br />. <530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.