Laserfiche WebLink
<br /> <br />. <br /> <br /> <br />:j <br />~ <br />~ <br />"!" <br />I.) <br /> <br />~ <br />'" <br /> <br />f <br /> <br />I <br />~ <br />~ <br />-- - 1'0 <br />- }j <br /> <br />. <br /> <br />. <br /> <br />most senior right will be curtailed the least on a <br /> <br />percentage basis. Percentages of curtailment will <br /> <br />be based on a straight line relation between these <br /> <br />two extremes of priority. <br /> <br />e. Deliveries to Colorado appropriators will start <br /> <br />..77:7 d's <br />'T.-;..I t>fdt!u'Iutl <br />wdfer "f ,fi. _~ at 85% of the amount of the discharge at the Del Norte <br />,f,..... i" Wb I!-O <br />~"'~/, j"e....-:, I'lS'I <br /> <br />0115 <br /> <br />Index Station. This amount will be dis tributed to decrees <br /> <br />Cf,fAPI! ~R 2()% C'tI,tT,4IU1lIVT <br />- <br />OF WA TE".{' RIC;J(TS in order of priority (considering each decree's percentage <br /> <br />of curtailment) until the entire amount is delivered. <br /> <br />f., If, at any time, this delivery schedule results in a <br /> <br />flow at Alamosa in excess of 3,500 cubic feet per second. <br />.j7///r;J SU9'1ss7'.eJ "R_?n ,e"",J>> t!'.",t 10 2"00 .cf'S <br />delivery to Colorado appropriators may be increased <br /> <br />temporarily to include deliveries to additional decrees <br /> <br />within the priority system to prevent flooding at Alamosa, <br /> <br />g. Every ten days throughout this period. a status report <br /> <br />will be made by the Division Engineer to reflect the <br /> <br />accuracy of the monthly and annual estimates of both <br /> <br />the supply at the Del Norte Index Station and the <br /> <br />delivery at the Lobatos Gaging Station and deliveries <br /> <br />adjusted when necessary. <br /> <br />-6- <br /> <br />