My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04197
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:38:17 AM
Creation date
10/9/2006 4:29:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100
Description
Rio Grande Basin-Basin Multistate Organizations-Rio Grande River Compact Administration
State
CO
Basin
Rio Grande
Water Division
3
Date
5/8/1973
Title
Rio Grande Compact Commission Minutes Corres Reports etc 1963-76-Colorado Revised Statutes 1963-Section 148-21-3-3 and 4-General Operating Criteria
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />'" <br /> <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br /> <br />3. April through September <br /> <br />011'7 <br /> <br />a. Direct flow diversions may commence upon a date <br /> <br />to be detennined annually by the State Engineer after <br /> <br />consultation with the Rio Grande Water Conservation <br /> <br />District, the Conejos Water Conservancy District and <br /> <br />other interested entities. <br /> <br />b. Actual runoff at the Mogote Index Station for the <br /> <br />months of January, February and March and the estimated <br /> <br />runoff for October, November and December will be <br /> <br />combined to provide an estimated supply at that station <br /> <br />during the non-irrigation season. The actual Conejos <br /> <br />River deliveries at La Sauses gaging station for January, <br /> <br />February and March will be combined with the estimated <br /> <br />deliveries at La Sauses for October, November and <br /> <br />December and deducted from the estimated annual <br /> <br />delivery requirement to provide an estimated delivery <br /> <br />requirement for the remainder of the year. <br /> <br />c. From the estimated monthly runoff pattern at the <br /> <br />Conejos River near Mogote, the Los Pinos near Ortiz, <br /> <br />and the San Anotonio River at Ortiz, monthly delivery <br /> <br />requirements at the Las Sauses gaging station will be <br /> <br />projected for the months of April through September. <br /> <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.