My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC04168
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC04168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:38:09 AM
Creation date
10/9/2006 4:28:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.950
Description
Section D General Studies - General Water Studies
State
CO
Basin
Statewide
Date
9/14/1979
Author
Unknown
Title
High Plains Study - Six-State High Plains-Ogallala Aquifer Area Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003356 <br /> <br />." . J''''''.- <br /> <br />" <br />, <br /> <br />Bill Smith <br />79-586 <br />Page 3 <br /> <br />TECHNICAL COORDINATION COMPONENT <br /> <br />Description <br /> <br />The coordination of Colorado portion of the High Plains project will be shared by <br />two agencies: the Colorado Department of Natural Resources (DNR). and the Colorado De- <br />partment of Agriculture (CDA) , General coordination between Colorado. the other states <br />in this project. and the General Contractor--including fiscal coordination--will be <br />handled by DNR. More specificially. Mr. Bill Smith. Deputy State Water Engineer in DNR. <br />will continue as state coordinator, <br /> <br />Technical coordination will be handled by CDA under the direction of Dr. David <br />Carlson. with assistance from Mr. James Rubingh. of the Resource Analysis Section of <br />the Department. Technical coordination includes monitoring the progress of individual <br />work elements to insure completiol] of these elements in a timely manner. and resolving <br />difficulties in timing and content. if any. between state and regional task elements. <br />In addition. technical coordination includes management--both technical and fiscal-- of <br />the public involvement program described earlier. <br /> <br />Budget <br /> <br />a. Relief staff."..,...."..,......,...................".... .$21.500 <br /> <br />In order for CDA to provide technical management. it is <br />necessary to hi re a staff researcher for the Resource <br />Analysis Section to perform certain duties of Dr, Carlson <br />and Mr, Rubingh. both of whom will be involved in techni- <br />cal coordination, The time and cost for Carlson and <br />Rubingh to provide technical management over the next 22 <br />months is: <br /> <br />Carlson: $2294 x 22 months x 1/5 time.,...,$10.094 <br /> <br />Rubingh: $1552 x 22 months x 1/3 time.,...,$11.381 <br /> <br />These funds will be used to hire a person at the Researcher <br />I level for the duration of the project. (For comparison. <br />Rubingh is at the Researcher III level and Carlson is at the <br />Researcher V level.) <br /> <br />\ <br /> <br />, <br /> <br />Trave 1 expenses: , . , . . . . . . . . . . . , . . . , . . . . . . . . . , . . . ,. . , , . . . . , . . . . $ 3.200 <br /> <br />6 out-of-state trips @ $300..,............ ,$ 1.800 <br />5 overnight stays in region @ $40.....,....$ 200 <br />400 miles x 22 months x 14 cents/mile......$ 1.232 <br /> <br />c. Office expenses: copying. long distance telephone calls. <br />etc."."........,.....,..,......,.............,...,.........$ 300 <br /> <br />d. Contingency fund (for unforseen expenditures; may be used for <br />publishing additional copies of the report. professional <br /> <br />test edi ti ngs. etc)...".....,...,......................,.... $ 5 .000 <br /> <br />Total Technical Coordination Budget...."....,...,............... ..$30.000 <br /> <br />b. <br /> <br />, <br /> <br />" <br /> <br />, <br /> <br />DC:bk <br /> <br />--\q - <br />
The URL can be used to link to this page
Your browser does not support the video tag.