Laserfiche WebLink
<br />OJJ328 <br /> <br />. <br /> <br />-14- <br /> <br />( <br /> <br />E. Background materials for the preparation of the General <br />Contractor's (or grantee's) proposal will consist of the <br /> <br />following: <br /> <br />* This outline and any supporting materials <br /> <br />* The outline of the "High Plains Ogallala <br />Aquifer Study" and any other state materials <br /> <br />* The General Contractor's own internal ability <br />and resources. <br /> <br />F. The General Contractor will prepare the draft report for <br />the approval of the High Plains Study Council. <br /> <br />, <br /> <br />G. The High Plains Study Council will issue a final report <br /> <br />with recommendations in compliance with applicable <br /> <br />statutory requirements. <br /> <br />( <br /> <br />C" <br />