Laserfiche WebLink
<br />of the Bureau plan. It was the definite opinion of all proscnt that <br />the work should be prosecuted without dolay in order that the foasi- <br />bility of the plan cen be definitely ootablished. <br /> <br />During thc month Project forces were engaged in the install- <br />ation of water sampling wells, the colleetion of water samples, and the <br />running of oonductanoe tests on the samples oollected. During the <br />latter part of the month a jeep drill rig was obtained to aasist in <br />putting down the sampling wells. By month's end 60% of the work had <br />been completed on tho j.n:ltellat:l.on of five sampling stations. }l:Ooh <br />station m.ll permit shallow, medium end deep sampling by means of It" <br />pipes equipped with sand-points. <br /> <br />Conejos Division <br /> <br />PlBtoro Reservoir was empt:ted and tho Gate Tender moved out <br />of Platoro during November 1955. <br /> <br />On December 16th, 1955, the Pz'oject Manag&T attended a meet- <br />ing of the Bosrd of Direotors of the Mogote and Northeastern Ditch of <br />the Conejos Divieion. The Board of Directors ie practically the ssme <br />for the Romero Ditoh too, therefore tho one meeting covered those two <br />ditohes. The Project Maneger discuosed OP.1rllti.ons of Platoro Reoervoir <br />end other water problems, follo'1ling whioh he invited questions from <br />the Duaienoe. The questioDo ezked indic~ted a better realization, by <br />the water users, of the value of water and the laws and regulations <br />oonoerning water uee than hed heretofore been observed in the Conejos <br />Ares. Following the meeting Project Uanager was invited to attend <br />the llnnual meeting of [;lannssa Di toh, whi.oh will be held Februliry 1956, <br />and tho annuel meeting of the Conejos Water Users Assooiation, the <br />date for whioh has not been set. <br /> <br />General <br /> <br />Exoeedingly mild weather prevailed throl1ghout the month of <br />Deoember in the San Luis Valley. Project foroos were able to work in <br />the field with no discomfort throughout the month. <br /> <br />, <br /> <br />\\\\\~'&\\ <br />