My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03798
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC03798
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:36:21 AM
Creation date
10/9/2006 4:11:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
Rio Grande Basin-Rio Grande Basin River Basin Water Projects-San Luis Valley Project
Basin
Rio Grande
Water Division
3
Date
1/1/1955
Title
San Luis Valley Project Monthly Reports-1955
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />At the end of the month arrangements had been ll1llde with <br />the Colorado Water Conaervation Board tor analyslls of WIlter Gllmplell <br />which will be colleoted by Projeot personnel. <br /> <br />Conejoa Division <br /> <br />At Ill1dnight, October 14, 1955, the flow of water through <br />Plat01'O Reservoir WIlIl shut off in order to permit repairs to tho <br />ooal tar enamel lining of the outlet pipe. Permission to close <br />the valves had been previously seoured from the Rio Grsnda Compact <br />Commissioners for New Mexico end Texas through the Rio Grande Com- <br />paot Commille1oner for Colorado. During the days following the <br />ahutting oft of the water. work WllS acoomplished by Projeot foroes <br />end the natural flow of the Conejos River WllS again passed through <br />the reservoir starting at 6.00 P.ll, October 12. 1955. By the end <br />of the month arrangements had beon ll1llde to deliver 1llltor in Plat01'O <br />Reservoir, as debit water under the Fda Grande Compact, to New lAex- <br />100 at the state line. <br /> <br />It io antioipated that the gate tender at PJ,atoro Dam <br />will be moved out for the winter following the emptying at the <br />reservoir, whioh should be completed by November 4th, 1955. <br /> <br />genersl <br /> <br />Seven hundredths of an inoh of preoipitation was recorded <br />at Monte Vista during the month. Normal for Ootober is 0.51 inoh. <br /> <br />2 <br /> <br />\)\)\911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.