Laserfiche WebLink
<br />The fluctuation of the ground-water table was measured at <br />key welle during the month. <br /> <br />Cone.ioe .Qivieion <br /> <br />A request was IllUde to the Project /danagor by Iilr. Vi. F. <br />llllwkins, one of the owners of the Foroet King Group of mining clBims, <br />for permission to construct s road from the east end of Plutoro Dam <br />to the Forest King Claims. The matter NaS referred to the Regional <br />Direotor with recommendations. <br /> <br />By t.he end of September sll preparations had been made for <br />rep!i1ring the coal tar enamel coating in the outlet pipe at PlBtoro <br />Dam. Wet0I' .dll be turned off on October 15. Natural flow of the <br />Conejos River will be passed through the reservoir after repair work <br />is oompleted and before November 1. At midnight November 1 all water <br />in storage will be released as debit water, in compliance With the <br />terms of the Rio Grende Compact. <br /> <br />General <br /> <br />.. .' .Prfloipfta'tion fori septembor at Monte Vista was 0.31 inoh, <br />48% of normal. Heavy frosts occurred during the latter part of the <br />month stopping rnO<lt orop growth. Potato harvest was in full swing <br />by the end of the month. <br /> <br />\)\)11314 <br />