Laserfiche WebLink
<br />r <br /> <br />O\l~~~~ <br /> <br />Operations Code Overview <br /> <br />FindAn y Pro je ctOe ma nd 5 With Sh 0 rta ges [PROTO CO L. MO OJ <br /> <br />This is the key procedure with respect to the handling of "projects." It is called <br />following a water rights step and its job is to inspect all demands which are aftiliated with any <br />reservoir as a source of project water and, in general, to set up both the demand and the <br />reservoir for the project-deliveries "allocation sub-step," whenever it tinds such a demand with <br />a shortage. This procedure returns TRUE if it tinds any condition which would require a <br />project deliveries step, FALSE otherwise. <br /> <br />The inspection conducted by this procedure is divided into three parts. First the UVP <br />canals are inspected, then the "generic" one-reservoir projects are inspected and tinally any <br />other special projects (Project 7 and the Cimarron Canal, North Village, etc.) are inspected to <br />determine if there are any project demands with shortages. <br /> <br />SaveWaterRightsOiversions [PROTOCOL. MO OJ <br /> <br />This procedure is called following a water rights "tlow-routing" solution sub-step, when <br />it is known that a non-water rights solution step will be necessary. The purpose of this <br />procedure is to assure that the diversions which were computed on the basis of the relative <br />priorities of water rights are lli'<~served in any subsequent sulution steps. The categories of <br />water rights diversions to be saved include direcHlow out-of-channel rights and storage rights, <br />but do not include minimum-instream-tlow rights, which were effectively saved immediately <br />following the 'solution by calling ConvertlnstreamFlowsToInChannel. <br /> <br />OoProjectOeliveriesStep [OOPROJCT.MOO] <br /> <br />SetUpUVPForT aylorPa rkAllocation [DO PROJCT. MOD] <br /> <br />This procedure handles opening and closing the appropriate "gate" arcs and connecting <br />the appropriate "extension corcl" arcs at Blue Mesa, the Gunnison Tunnel, and the <br />Uncompahgre Valley Project demands. Specitically it freezes the Blue Mesa bypass and <br />controlled outtlow links and opens the project gate. It opens the Gunnison Tunnel project <br />release gate and connects it to the UVP Blue Mesa allocation node. It also freezes the tlow <br />through the South Canal and AB Lateral hydropower links and opens the project gates of UVP <br />demands which have shortages and of the Fairview Feeder Canal if Project 7 exists and is <br />shorted. <br /> <br />SetUpUVPforRidgway Allocation [OOPROJCT. MOD] <br /> <br />This procedure handles setup of extension cords and gates when the Uncompahgre <br />Valley Project canals need a project delivery from Ridgway Reservoir. This procedure is <br />essentially the same as the SetUpUVPForTaylorParkAllocation except that operates on <br />Ridgway's outtlow and project gates. <br /> <br />6 <br /> <br />