Laserfiche WebLink
<br />r <br /> <br />~. 000337 <br /> <br />Opermi{lnS Code Overview <br /> <br />and controlling the additional solutions required when the AB Lateral hydro project is <br />operated. <br /> <br />Procedures called from OoWaterRightsStep include: <br /> <br />InitABPowerFor AgricAllocationStep [OORI GHTS. MOD ] <br />SetUpU ncompahgreRightFor AllocatiunStep [OORIGHTS. MOD J <br />SetUpTunnelAgRightFor AllocationStep I DORIGHTS. MOD) <br />SetU p U ncumpahgreRightFor Flow Routi ngS tep 100RIG HTS. MOD] <br />SetUpTunnelAgRightF orFlow RoutingStep [DO RIG HTS. MOD] <br />SetUpABPowerFor AllocationStep [DOR!GHTS. MOD] <br />SetUpABPowerForReallocationStep [OOR! G HTS. M 00] <br />SetU pABPowerForFlowRoutingStep [OORI GHTS. MOD] <br />SaveCooperativeRelease [ACCOUNTG.MOD] <br />OoPostWaterRightsAccounting [ACCOUNTG. MOD] <br />Solve [CRAMHOOK.MOOj <br />CapacityAvailablelnTunnel [OORIGHTS.MOOI <br />ChecklnstreamFlowRights I DORIGHTS.MOD I <br />ContigureInstreamFlowsAsDemands [DORIGHTS. MOD I <br />CheckSilVed Divers ions I OOR I G HTS MOD I <br />GetParm (a CRAM Library procedure which retrieves network parameter settings) <br />ReportLoopConvergence [LOOPCO:--iV. MOD] <br />CatchAllSetUpForWaterRightsStep [DO RIG HTS. MOD J <br /> <br />The key procedures in this list that are called during a Baseline model scenario are <br />described below. <br /> <br />SetUpUncompahg reRi ghtFor AllocationS tep [DO RI G HTS. MO D ] <br /> <br />This procedure sets up the apPfLlpriate contigurations for the six Uncompahgre Valley <br />Project canals with headgates on the Uncompahgre River. depending upon whether or not the <br />Project's senior right on the Uncompahgre is calling. This procedure performs the "extension- <br />cord" connections of the water right gates from the six project canals to the distribution node <br />of the senior Uncompahgre Valley "meta" water right. <br /> <br />SetUp TunnelAgRightFor AllocationStep [DO RIGHTS. MOD] <br /> <br />This procedure sets up appropriate <:ontigurations for all ten of the Uncompahgre Valley <br />Project canals. depending upon whether or not the PfLlject's senior agricultural right at the <br />Gunnison Tunnel is <:alling. It does this by either closing the AB Laterai and South Canal tail <br />gates if there is no t10w through the Gunnison Tunnel project gate or by "freezing" them at <br />,their current level if there is tlow though the Gunnison Tunnel project gate. <br /> <br />InitABPowerFor AgricAllocationStep [DO RI G HTS. MOD] <br /> <br />This procedure closes the Gunnison Tunnel's hydropower water rights gates and the <br />temporary demand ami return t10w (which are used during the water rights allocation iteration <br /> <br />4 <br />