Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />April 19, 1994 <br /> <br />. April 20, 1994 <br /> <br />February 1995 <br /> <br />July 1995 <br /> <br />February 26, 1996 <br /> <br />B ~'12 2 0 <br /> <br />Reclamation requests initiation of ESA consultation <br />for the ALP project and critical habitat in anticipation <br />ofFWS designation of critical habitat for endangered <br />fish in the Colorado River Basin. <br /> <br />FWS designates critical habitat for Colorado River <br />endangered fish. <br /> <br />Project sponsors agree to divide Phase I of the project <br />into Stages A and B. In accordance with the project's <br />average annual depletion limitation of 57,100 acre-feet <br />specified in the reasonable and prudent alternative of <br />the 1991 FWS Biological Opinion, Stage A facility <br />construction is defined generally as: the Durango <br />Pumping Plant; Ridges Basin Dam and Reservoir; <br />Ridges Basin Inlet Conduit; Shenandoah Municipal <br />and Industrial (M&I) Pipeline; a Plata M&I (rural) <br />Pipeline; and regional road and utility relocations. <br />Also included is mitigation for fish, wildlife, and <br />wetlands. <br /> <br />Stage B construction includes Durango Pumping Plant <br />add-on pumps; Ridges Basin Pumping Plant, RBPP <br />transmission facilities; Long Hollow Tunnel, Durango <br />M&I Pipeline; Dryside Canal-Phase 1; Red Mesa <br />Pumping Plant-laterals-transmission facilities; Alkali <br />Gulch Laterals-phase 1; La Plata, NM Laterals-Phase <br />1; Dryside Lateral-Phase 1; Drains-Phase 1; NM <br />Interim Facilities; Shenandoah Pipeline; Southern Ute <br />Diversion Dam; and Southern Ute Inlet Canal. Also <br />included are recreation facilities, and fish and wildlife <br />and cultural resource preservation/enhancement. <br />Completion of Stage B allows the full development of <br />Phase 1. <br /> <br />Reclamation completes the Economic and Financial <br />Update Report. This detailed report utilized updated <br />designs and unit costs at the October 1993 price level. <br /> <br />FWS issues Final Biological Opinion. This opinion <br />deals with significant, new information that had <br />become available since the 1991 opinion. Reasonable <br />and Prudent Alternative elements are similar to the <br />1991 opinion with inclusions such as a clarification of <br />language on the allowable 57,100 acre-feet depletion, <br /> <br />1-6 <br />