My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03491
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:35:14 AM
Creation date
10/9/2006 3:58:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.O
Description
Colorado River Water Projects - Animas La Plata - Project Funding
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/2003
Author
DOI-BOR
Title
Animas La Plata Project - Construction Cost Estimates - Report to the Secretary - November 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> I <br /> with cultural resources until the Supplement to the I <br /> Final EIS is completed is granted. Other, non-ground- <br /> disturbing activities may proceed. I <br />Octoper 13, 1992 Reclamation files the Draft Supplement (DES 92-41) <br /> and initiates public review and comment. About 500 I <br /> comments were received by December 15, 1992. <br />November 30 - Public hearings in Durango, Colorado; Farmington, I <br />December 2, 1992 New Mexico, on December 1, 1992, and Denver, <br /> Colorado. About 125 statements received from the <br /> hearings. I <br />March 1993 Project re-pricing initiated to reflect current costs <br /> trends and project refinements and additions. I <br />June 24,1993 Reclamation completes Design C for the Durango <br /> Pumping Plant. I <br />July 20, 1993 The Cornmissioner of Reclamation issues a <br /> memorandum recommending a Final Supplement to I <br /> the 1980 Final EIS. It is to address issues raised <br /> during the comment period, and be based on updating <br /> impacts of the project described in the 1979 Definite I <br /> Plan Report (including refinements). It also will <br /> address Clean Water Act compliance requirements. <br />Nov. - Dec. 1993 Using 638 contracting procedures, cooperative I <br /> agreements are put in place with both the Southern Ute I <br /> Indian Tribe and the Ute Mountain Ute Tribe to <br /> conduct certain studies and analyses to help complete <br /> the Final Supplement. I <br />1994 P.L. 93-638 amended to include all Department ofthe <br /> Interior agencies. I <br />February 16, 1994 Consent decree is filed regarding the Four Corners <br /> Action Coalition et al. lawsuit. Reclamation agrees to I <br /> not perform cultural resources related ground <br /> disturbing activities prior to completion ofthe Final <br /> Supplement. The previous preliminary injunction is I <br /> vacated. <br />February 23, 1994 Design funds redirected from Durango Pumping Plant I <br /> to preparing the 1980 EIS Supplement. <br /> I <br /> 1-5 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.