Laserfiche WebLink
<br />,.;- ~. <br /> <br />: !:~~$'~21 <br /> <br />. <br /> <br />. <br /> <br />using present condition operating criteria, water supply and <br />water demands. The water operations from the state line to <br />Lewelln, Ne need to be added this includes ground water return <br />flows and ground water pumping effects in the Whelan diversion <br />dam to Lewelln, Ne river reach. For the South Platte river <br />reach a existing tool or model has not been identified <br />development and use of a model will not start till FY 1993. <br /> <br />Run baseline operation studies, select recent time period for <br />calibration and check baseline output with current operations. <br /> <br />Make alternative runs by varying inputs to examine prediction <br />capabilities. <br /> <br />I. Make evaluation study alternative operation studies and <br />compare results. <br /> <br />G. <br /> <br />H. <br />