My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03246
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:27 AM
Creation date
10/9/2006 3:48:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
Colorado River Water Projects - Colorado River Storage Project - CRSP - Publications
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/31/1972
Author
Unknown
Title
Project Reports-Summaries-Descriptions - Curecanti Storage Unit - CRSP
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OOJ~1S <br /> <br />. , <br />, <br /> <br />., <br /> <br />. . <br /> <br />. <br /> <br />1he first phasc,vhich ia now undorwaY,is construction of the river <br /> <br />diveraioQ tunnol and four foundation And exploration tunncl~ in the <br /> <br />d.:un abut.ments. The second phAse) to be started next sprin&} La con" <br /> <br />atruction of the concrete dam, powcrplant, and sw1tchyard. <br /> <br />Cryatal Dam ~111 havo 4 height of 351 feet above bedrock. This <br /> <br />will be 235 feet abovo .the prescnt streambed. It will have .Ii. creat. <br /> <br /> <br />lensth of 70S feet, .Ii. crest width of 10 feet, and .Ii. base width of <br /> <br />29 feet. Tho dam will contain 135,000 cubic yards of concreto. <br /> <br />The contract for the diversion tunnel and foundation and exploration <br /> <br />tunnelsJAwarded in June 1972)1& scheduled for completion in Ywrch 1973. <br /> <br />This contract is about 35 percent. complete at the prescne time. Con- <br /> <br />struction of the dam, powerplant and awitchyard is scheduled for <br /> <br />completion in 1977. .. <br /> <br />Cry8tal Dam will create a reservoir of 27,240 acre-feet. <br /> <br /> <br />plant will have a capacity of 28,000 k.w. <br /> <br />The poVoU r <br /> <br />A 8ummary of the schedule of work yet to be perfo~cd is shown on the <br />, <br /> <br />projection. <br /> <br />You will Dote we have co~pleted about $90,000,000 of work so far out of <br /> <br />the total estimated cost of about $130,000,000 for the Curecanti Unit. <br /> <br />There is $5,000,000 progr~ed for this year primarily for starting work <br /> <br />on Crystal D.am and Pow rpl..&.nt. <br /> <br />The - transparancies sho":'ehe operaci.-C;;of- bOth "re-;e~~irs from 7/1/71 <br /> <br />to 7/31/72. <br /> <br />This transparancy shows the power production and net sales froc the five <br /> <br />. <br />existing power units of the Colorado River Storage project for F.Y. 1971. <br /> <br />~ <br /> <br />- <br /> <br />o <br /> <br />~ <br /> <br />- <br />,,, <br /> <br />~ <br /> <br /> <br />'J <br />
The URL can be used to link to this page
Your browser does not support the video tag.