My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03231
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:23 AM
Creation date
10/9/2006 3:48:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/20/1996
Title
RTi HydroBase- CRDSS Scope of Services 3
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Because the overall functionality of the HB - CRDSS database is similar to the existing <br />CRDSS database, relatively little new code development is expected, <br /> <br />DMI Utility Code Changes, DMI Utilities that RTi will recompile, test and perhaps <br />modify in this Task include demandts, netresev, watrighl, makenet, and crdssdb, the <br />World Wide Web database interface program, It is anticipated that crdssdb will require <br />the most testing, <br /> <br />Testing Software changes to both Low level DMI's and DMI Utilities will be conducted <br />as follows: <br />. Software which access both the CRDSS and HB - CRDSS databases will be <br />compared for all command line options using a defined data set (one water district, <br />basin, or division), The data set will be selected randomly in concert with the State, <br />. Differences will be identified and resolved, <br />. A memo will be prepared documenting the testing procedures and results, <br /> <br />The above procedure is estimated to be adequate to assure but not guarantee that the <br />revised software produces the same results as the existing CROSS software, RTi will <br />resolve any differences which result from additional checks performed by the State and <br />reported to RTi within 2 weeks of the projected completion date, <br /> <br />Documentation Because the functionality of the software being revised in this Task is <br />not expected to change, little impact to existing documentation is expected, R Ti will <br />review and revise all existing CROSS documentation, including the User's Manual, <br />Developers Manuel, and man pages which may be impacted by this task. <br /> <br />De/iverables <br />RTi will provide: <br />1. Revised Low - Level DMI Routines that access the HB - CRDSS database, <br />2, Revised DMI Utilities that access the HB - CRDSS database, <br />3, Task memorandum documenting the testing procedures and results performed in this <br />Task, This memorandum is expected to contain approximately 15 pages, <br />4, Revised documentation, if necessary, including (User's Manual, Developer's Manual <br />and man pages), <br /> <br />Task R7 - Documentation and Delivery <br /> <br />Approach <br />Tasks R2, R3, R4 and R5 contain new sections to be added to the existing CRDSS <br />documentation, Additional documentation to be performed in this Task include: <br />. Miscellaneous edits to the Database section of the CRDSS Developer's Manual to <br />reflect the HB-CRDSS design, <br />. Miscellaneous edits to the CRDSS User's Manual to reflect the HB-CRDSS design, <br /> <br />Scope ofWark, HB - CRDSS, 12120/96 <br /> <br />() <} \.'5 <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.