<br />· Delivery of the HB-CROSS database to the central HydroBase server maintained by
<br />the State, Delivery may be as a database-unload to a tape, or the RTi may physically
<br />hand the whole development machine to the State representatives,
<br />
<br />Deliverable
<br />I. Revised CROSS Developer's Manual in the following formats: one hard copy, one
<br />version in Microsoft Word, and one version included in the existing on line (HTML)
<br />Developers Manual. Revisions to the Developer's Manual Database Section are
<br />expected to include:
<br />· Replace all references to the CROSS database with HydroBase,
<br />· Delete Section 3,0, Relationship of CROSS to HydroBase,
<br />· New section representing the results of Task R2, Database Pseudo Code,
<br />· New section representing the results of Task R3, Database Creation,
<br />· New section representing the results of Task R4, DWR Data Population,
<br />· New section representing the results of Task R5, Non- DWR data population,
<br />· Modified sections for the following;
<br />. 2,l Design Strategy
<br />· 2,2 Design Objectives, particularly 2,2.4,1 Database Storage,
<br />Requirements, 2.2.4 ,2 Non-relational Storage Requirements, 2,2,5
<br />User Access, 2,2,6 Maintenance and Support
<br />· Replace the Entity-Relationship Diagram with Exhibit I,
<br />· A Data Dictionary (Entity and Attribute Definitions)
<br />
<br />2, Revised User's Manual in the following formats: one hard copy, one version in
<br />Microsoft Word, and one version included in the existing online (HTML) Developers
<br />Manual. Revisions to the CROSS User's Manual are expected to include:
<br />· Modified version of the User's Manual Database Section,
<br />3, Delivery of the HB-CROSS database to the State,
<br />
<br />Task R8 - Contingency
<br />
<br />Approach
<br />This task contains activities which cannot be anticipated at this time, RTi will perform
<br />no work in this task unless authorized in writing by the State, Following is one of several
<br />potential activities which may be performed as a Task Order under this Task.
<br />
<br />Platform Change Task Order Tasks RI-R7 assume all work will be performed for use on
<br />an existing Silicon Graphics, UNIX platform, running Informix, Currently the State is
<br />evaluating the potential benefit of changing to a Windows NT platform, Selection of a
<br />platform will be made by the State to RTi in writing 3 days before the RTi is scheduled
<br />date to begin Task 3 - Create Database, If Windows NT is not recommended by the State
<br />no work will be performed in this task order, If Windows NT is recommended by the
<br />State, the cost associated with this selection will be charged to this task order. Note the
<br />budget for this task order does not include any costs associated with purchasing computer
<br />hardware, Also, the schedule assumes this change order or others will occur,
<br />
<br />Scope of Work, HB - CRDSS, 12/20/96
<br />
<br />()<j\.c\
<br />
<br />10
<br />
|