Laserfiche WebLink
<br />· Delivery of the HB-CROSS database to the central HydroBase server maintained by <br />the State, Delivery may be as a database-unload to a tape, or the RTi may physically <br />hand the whole development machine to the State representatives, <br /> <br />Deliverable <br />I. Revised CROSS Developer's Manual in the following formats: one hard copy, one <br />version in Microsoft Word, and one version included in the existing on line (HTML) <br />Developers Manual. Revisions to the Developer's Manual Database Section are <br />expected to include: <br />· Replace all references to the CROSS database with HydroBase, <br />· Delete Section 3,0, Relationship of CROSS to HydroBase, <br />· New section representing the results of Task R2, Database Pseudo Code, <br />· New section representing the results of Task R3, Database Creation, <br />· New section representing the results of Task R4, DWR Data Population, <br />· New section representing the results of Task R5, Non- DWR data population, <br />· Modified sections for the following; <br />. 2,l Design Strategy <br />· 2,2 Design Objectives, particularly 2,2.4,1 Database Storage, <br />Requirements, 2.2.4 ,2 Non-relational Storage Requirements, 2,2,5 <br />User Access, 2,2,6 Maintenance and Support <br />· Replace the Entity-Relationship Diagram with Exhibit I, <br />· A Data Dictionary (Entity and Attribute Definitions) <br /> <br />2, Revised User's Manual in the following formats: one hard copy, one version in <br />Microsoft Word, and one version included in the existing online (HTML) Developers <br />Manual. Revisions to the CROSS User's Manual are expected to include: <br />· Modified version of the User's Manual Database Section, <br />3, Delivery of the HB-CROSS database to the State, <br /> <br />Task R8 - Contingency <br /> <br />Approach <br />This task contains activities which cannot be anticipated at this time, RTi will perform <br />no work in this task unless authorized in writing by the State, Following is one of several <br />potential activities which may be performed as a Task Order under this Task. <br /> <br />Platform Change Task Order Tasks RI-R7 assume all work will be performed for use on <br />an existing Silicon Graphics, UNIX platform, running Informix, Currently the State is <br />evaluating the potential benefit of changing to a Windows NT platform, Selection of a <br />platform will be made by the State to RTi in writing 3 days before the RTi is scheduled <br />date to begin Task 3 - Create Database, If Windows NT is not recommended by the State <br />no work will be performed in this task order, If Windows NT is recommended by the <br />State, the cost associated with this selection will be charged to this task order. Note the <br />budget for this task order does not include any costs associated with purchasing computer <br />hardware, Also, the schedule assumes this change order or others will occur, <br /> <br />Scope of Work, HB - CRDSS, 12/20/96 <br /> <br />()<j\.c\ <br /> <br />10 <br />