My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03189
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:13 AM
Creation date
10/9/2006 3:47:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Colorado River Basin-Water Projects-Central Utah Participating Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/12/1988
Title
Central Utah Project-Ceiling Increase Legislation-Study WP1-WP2-WP4-PP1-PP4 and PP6
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />- <br />. <br /> <br />BASE STUDY <br /> <br />STUDY' WP-1 <br />FILE NAMES: <br />RSPAYI.B7.UCRC/WP1 <br />RSPAYP.87.UCRC/WP1 <br /> <br />Assumptions <br />. FY 1987 CRSP PRS except: <br />. No fuel replacement sales. <br />. No purchased power expense for fuel replacement sales. <br />. 1987 replacements as corrected. <br />. Present worth participating projects "Sunk Costs" (projects completed <br />and under construction, plus Animas-LaPlata Phase I, plus $112 million <br />Aid to Irrigation less H&I revenues). Service bonds at ~% for 40 <br />years as an other expense. <br />. H&I revenues applied to bond payments. <br />. Power investment includes construction scheduled for completion <br />through 1995 from the 1989 Congressional and 1990 internal budgets. <br />. No future participating projects except as described above. <br />. No apportionment to states. <br />. Rate effective in 1990. <br />. Study ends in 2070. <br />. 8ase rate of 9.58 mills/kWh. <br /> <br />------------------------------------------------------------------------------ <br /> <br />COMPARATIVE STUDY: <br /> <br />PURPOSE: Water Users Proposal - Assess the impact of the Water Users proposal <br />on power rates. <br /> <br />Compo Component: Rate .0085 Start 1995 Stop 2044 <br /> <br />Rate: Flat <br /> <br />ARD X <br /> <br />Stepped: Yr._____ Rate_____ Yr.____ Rate_____ <br /> <br />Special Requirements: Repay power investment on line as of the date the <br />legislation enacted by 1994. <br />Assumption: All investment scheduled bor completion by 1990 would be <br />repaid by 1994. Balance of investment to be repaid in the normal <br />manner. <br />Used fiscal years instead of beginning in January (calendar years). <br /> <br />------------------------------------------------------------------------------ <br /> <br />Results of Study: Rate 16.96 Pinch Point 1994 Cause Aspinall/Seedskadee <br /> <br />$ available to Water Users: 1990-2000 $288.337,000 <br />2001-2010 $473,730,500 <br />Total for all years $2,322,153,500 <br /> <br />Interest on power investment = $66,996,524 <br />Interest on replacements = $ 2m366m247 <br />Total interest = $69,362,771 <br /> <br />2284 <br />
The URL can be used to link to this page
Your browser does not support the video tag.